Weather and climate risk workflows for construction — from feasibility to claims

Every weather decision on your project. Automated.

40 workflows, 5 live today and the rest coming soon. 45 years of weather at your site. One platform from feasibility to claims. Start free.

WeatherWise Construction in under a minute · 51sWatch on YouTube →

WeatherWise gives construction and infrastructure teams automated weather workflows across the project lifecycle: 5 are live today, and the rest are coming soon.

Start with something you already have — a site pin, programme or contract date — and get the weather statistic or calendar you need in as little as a few minutes; forecasts and evidence packs are coming soon.

Built on 45 years of world-leading reanalysis datasets, up to 9 km grid, calibrated to construction thresholds and validated against site observations.

No card. No call. 1,000 free credits cover a first run of many workflows.

92.3%
accuracy
400+
projects
£50bn+
infrastructure
45+ yrs
reanalysis data
80+
variables

All workflows

Phase

Showing 40 of 40 workflows

Workflow types

⚡ InstantRuns automatically, with results in as little as a few minutes.

✓ ReviewedChecked by an EHAB analyst before release. Results in 1–6 days, depending on the workflow.

Most run

Feasibility & consent

Weather is a design input. Coming soon: the right statistic at the site, before it becomes a problem later.

Feasibility workflows →
Coming soon
FLOOD SCREEN · 5 LAYERS · CLIMATE UPLIFT 1.1 SITEFZ3FZ2FRA · STANDARD

1.1Flood Risk Screening Report

⚡ Instant

Does this site need a flood risk assessment?

Expected: Starting from 450 credits per site

as little as 3 min · 3 steps

What it will doScreens the site boundary for fluvial, surface water, groundwater, reservoir and sewer flood risk, applies the current climate uplift, and flags whether a full FRA is required.

You'll getFlood screening report · Zone and layer maps · FRA scope recommendation

Output  PDF reportConnects to  API

Coming soon
RAINFALL · HOW HARD, HOW OFTEN 1.2 1:100 + 40%CURRENTOLD FIGURESDURATION →mm/h

1.2Drainage Design Rainfall Report

⚡ Instant

Use the right rainfall figures for drainage design

Expected: Starting from 175 credits per site

as little as 3 min · 3 steps

What it will doReturns the rainfall figures needed for drainage design using current climate allowances, and flags when national baselines have been superseded.

You'll getRainfall input pack · Climate uplift applied · Superseded-baseline flag

Output  CSV dataConnects to  API

Coming soon
WIND AT YOUR SITE · BY DIRECTION 1.3 N< 5 m/s5–10 m/s> 10 m/sPREVAILING SW

1.3Site Wind Climate Report

⚡ Instant

How windy is the site — and from which direction?

Expected: Starting from 350 credits per site

as little as 3 min · 3 steps

What it will doShows wind speed, frequency and direction at the site, giving your design team or wind consultant a site-specific baseline.

You'll getWind rose · Directional exceedance tables · Roughness notes

Output  CSV data

Coming soon
CLIMATE HAZARDS · NOW TO 2100 1.4 NOW203020502100HEATCOLDRAINWINDDROUGHTFLOOD

1.4Climate Hazard Baseline Report

✓ Reviewed

See the site's climate risk now to 2100

Expected: Starting from 950 credits per asset

1–3 days · 4 steps

What it will doShows exposure to heat, cold, heavy rain, wind, drought and flood today — and how it changes by 2030, 2050 and 2100.

You'll getHazard baseline pack · Change signals by scenario · ISO 14091-ready evidence tables

Output  Excel workbookConnects to  API

Coming soon
WIND & WAVES · WORKABLE MONTHS 1.5 JFMAMJJASONDWAVE LIMIT 1.5 m

1.5Metocean Conditions Report

✓ Reviewed

Know the workable offshore months before you plan

Expected: Starting from 1,500 credits per site

2–5 days · 3 steps

What it will doShows how often wind, waves and currents are within your working limits, month by month, using 45 years of conditions.

You'll getNormal-conditions statistics pack · Monthly persistence tables · Validation notes

Output  Excel workbook

Coming soon
ENERGY MODEL · WEATHER FILE CHECK 1.6 FILEYOUR SITEP90CITY HEAT +1.8°C

1.6Energy Model Weather File Check

⚡ Instant

Is your energy model using representative weather?

Expected: Starting from 250 credits per site

as little as 2 min · 3 steps

What it will doChecks the weather file in your energy model against conditions at the site, including urban heat effects, and recommends a better-matched file where needed.

You'll getWeather-file suitability note · Recommended file and percentile · UHI flag

Output  PDF report

Design

Design values can be based on records that ended decades ago. Coming soon: check them against the last 45 years at the site.

Design workflows →
Coming soon
DESIGN WIND SPEED CHECK 2.1 CODE VALUE22.0 m/sYOUR SITE24.1 m/sΔ +9.5%

2.1Design Wind Speed Check

⚡ Instant

Check the design wind speed against the site

Expected: Starting from 350 credits per site

as little as 2 min · 2 steps

What it will doCompares the wind speed in the design code with 45 years of conditions at the site and quantifies the difference.

You'll getSite check note · Code vs observed · Confidence band

Output  PDF report

Coming soon
SNOW · FROST · ROOF LOADS 2.2 DRIFTGROUND SNOW LOADCODESITE0.50 → 0.70 kN/m²

2.2Snow and Thermal Load Check

⚡ Instant

Check snow, frost and thermal design values

Expected: Starting from 350 credits per site

as little as 2 min · 3 steps

What it will doCompares code snow, frost and temperature values with 45 years of site conditions and flags material differences.

You'll getSite check note · Thermal envelope · Exceptional-snow flag

Output  PDF report

Coming soon
RAIN ON THE FACADE · AT YOUR SITE 2.3 SHELTMODSEVEREV.SEV

2.3Driving Rain Exposure Report

⚡ Instant

Check driving rain exposure at the facade

Expected: Starting from 275 credits per site

as little as 2 min · 3 steps

What it will doCalculates how strongly wind-driven rain affects the facade at this site, rather than relying only on a national grid value.

You'll getExposure grade · Driving rain rose · Deviation flag

Output  PDF report

Coming soon
WORST CASE · WITH ERROR BARS 2.4 1:21:101:1001:1000

2.4Extreme Value Analysis Report

✓ Reviewed

Quantify the weather extremes your design needs to withstand

Expected: Starting from 950 credits per site

1–3 days · 4 steps

What it will doEstimates 1-in-100 and 1-in-1,000 year wind, rainfall and temperature extremes, with uncertainty bands and method comparison.

You'll getReturn-period table · Uncertainty bands · Method comparison

Output  Excel workbook · PDF report

Coming soon
CLIMATE ALLOWANCE WATCH · MONTHLY 2.5 REV 2026A66 · RIVER EDENAFFECTEDM4 J12 · THAMESHS2 · COLNEAFFECTEDSOLENT HUB

2.5Climate Allowance Monitor

⚡ Instant

Know when updated climate guidance affects a live design

Expected: Starting from 25 credits per project per month

Runs monthly · 3 steps

What it will doMonitors regulator guidance and flags live designs affected by changes in hazard, river basin or asset lifetime assumptions.

You'll getChange alert · Affected-project list · Re-run checklist

Alerts by  EmailConnects to  API

Bid, tender & contract

This is where weather becomes time and money. Set the allowance, contract baseline and risk model with an auditable method.

Already using activity codes? WeatherWise reads them straight in. If not, we'll help set them up once so future programmes run straight through. Onboarding & support →

Bid & contract workflows →
YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS

3.1Weather Downtime Allowance Report

⚡ Instant

How much weather should you allow in the bid?

Starting from 1,500 credits per programme

as little as 4 min · 5 steps

What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.

You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail

Connects to  P6 · Asta · OPC · Safran

RISK MODEL · REAL WEATHER 3.2 P80+4 MONTHSONE GUESSREAL WEATHER

3.2QSRA Weather Risk Model

✓ Reviewed

Put realistic weather risk into your QSRA

Starting from 2,250 credits per programme

1–2 days · 4 steps

What it doesReplaces a single generic weather assumption with linked weather risk distributions for the activities actually exposed.

You getWeather risk distributions · Correlation structure · P50/P80 dates · Tornado contribution

Connects to  Safran · Acumen · PRA · OPC · N&L

CONTRACT WEATHER LINE · NEC 3.3 RAIN>5MMFROSTSNOWJFMAMJJASOND31 km · +84 mSTN

3.3NEC Contract Weather Baseline

⚡ Instant

Set the NEC weather baseline for the site

Starting from 350 credits per contract

as little as 2 min · 4 steps

What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.

You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options

Output  PDF report

Coming soon
MITIGATION vs REPROGRAMME 3.4 P(FROST) 34%ENCAPSULATE + HEATMOVE TO SPRINGPROB-WEIGHTED £

3.4Weather Mitigation Appraisal

⚡ Instant

Protect the work or reprogramme it?

Expected: Starting from 600 credits per programme

as little as 4 min · 5 steps

What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.

You'll getDecision table · Probability-weighted cost per option · Preferred option

Output  Excel workbook · PDF report

Coming soon
OFFSHORE · WORKABLE WINDOWS 3.5 JFMAMJJASONDWAIT ON WEATHER 18–31 DAYS

3.5Weather Window Analysis

✓ Reviewed

Price wait-on-weather before the campaign starts

Expected: Starting from 3,500 credits per campaign

3–5 days · 5 steps

What it will doRuns your offshore campaign against every year on record to show workable windows, waiting time and campaign duration by month.

You'll getWindow distribution by month · P50/P90 campaign duration · WoW day allowance · Vessel-cost exposure

Output  Excel workbook

On site

Weather costs money when work stops. Today, refresh the weather calendars on each programme update; coming soon, site forecasts will call it earlier and the evidence ledger will keep the record as you go.

Already using activity codes? WeatherWise reads them straight in. If not, we'll help set them up once so future programmes run straight through. Onboarding & support →

On site workflows →
WEATHER RISK · RE-RUN ON THE UPDATE 4.1 BAD JANUARYOCTNOVDECJANFEBMARAPRMAYJUNP80P50

4.1Live Weather Calendar Service

⚡ Instant

Is your programme still on the tender weather calendars?

Starting from 100 credits per site per month

On demand · 4 steps

What it doesRe-runs the weather risk on each programme update you import and generates fresh weather calendars to import into P6 or Asta, or syncs them into OPC, on demand.

You getRefreshed weather calendars · Revised P50/P80 completion · Calendars for P6, Asta and OPC

Connects to  P6 · Asta · OPC

Coming soon
CRANE WIND · SITE FORECAST 4.2 10 m FORECASTGUST 17.4 m/s · OVER LIMIT

4.2Crane Wind Forecast

⚡ Instant

Can the crane lift today?

Expected: Starting from 150 credits per site per month

Runs daily · 5 steps

What it will doChecks the site's daily wind and gust forecast against the limits you set for your cranes and lifts, and emails an alert when a day in the 14-day forecast crosses one.

You'll getSite wind and gust forecast · Email alert when a limit is crossed · 14-day outlook

Alerts by  Email

Coming soon
CONCRETE POUR · 72-HOUR CALL 4.3 T-72hPOURFROST 02:00–06:000.8 kg/m²/h

4.3Concrete Pour Forecast

⚡ Instant

Pour now or wait?

Expected: Starting from 75 credits per site per month

Runs daily · 4 steps

What it will doForecasts temperature, wind, humidity, solar radiation, evaporation and frost through the pour and curing window, with a proceed/defer alert up to 72 hours ahead.

You'll getPour-window forecast · Evaporation and frost flags · Proceed/defer alert 72h out

Alerts by  SMS · Email

Coming soon
EARTHWORKS · HOW WET IS THE GROUND 4.4 LAST 14 DAYS OF RAINGROUND CONDITIONMARGINAL · CHECK AGAIN 06:00

4.4Earthworks Trafficability Forecast

⚡ Instant

Will the ground be workable this week?

Expected: Starting from 250 credits per site per month

Runs daily · 4 steps

What it will doUses recent and forecast rainfall to estimate ground condition and daily earthworks trafficability.

You'll getDaily trafficability index · 14-day outlook · Season yield P20/P50/P80 · Lost-day log

Alerts by  EmailConnects to  API

Coming soon
NIGHT SHIFTS · WILL IT GO AHEAD? 4.5 MON92%TUE88%WED46%THU82%FRI90%SAT30%SUN76%

4.5Coating and Surfacing Window Forecast

⚡ Instant

Will the shift stay inside product weather limits?

Expected: Starting from 75 credits per site per month

Runs daily · 4 steps

What it will doChecks every product data-sheet limit across the full application and curing window, then scores upcoming shifts by weather risk.

You'll getPer-product window forecast · Booking-risk score · Readings log for warranty

Alerts by  SMS · Email

Coming soon
SCAFFOLD · WIND WATCH 4.6 DESIGN LIFESTANDING6 WK → 9 MO

4.6Temporary Works Wind Monitor

⚡ Instant

Is the scaffold still within its wind design assumptions?

Expected: Starting from 50 credits per site per month

Runs daily · 4 steps

What it will doTracks structure-specific wind triggers, prompts actions such as removing sheeting or securing, and flags when exposure duration exceeds the assumed design return period.

You'll getTrigger alerts · Exposure-duration flag · Post-event inspection prompt

Alerts by  SMS · Email

Coming soon
EVIDENCE LEDGER · WHAT IT STOPPED 4.7 12 NOV13 NOVLOST 4h14 NOV15 NOVLOST 2h16 NOVWHAT DID ITSTOP TODAY?PourLiftEarthworks

4.7Weather Evidence Ledger

⚡ Instant

Record exactly what the weather stopped each day

Expected: Starting from 100 credits per site per month

Runs daily · 5 steps

What it will doRecords weather at the site and the contract station, asks the site team to log the activities, crews and plant affected, links the record to the programme, and raises early-warning prompts.

You'll getDaily record · What-it-stopped log · Station comparison · Early-warning prompts · Claim-ready pack

Connects to  P6 · Asta

Coming soon
STORM WARNING · FOR YOUR SITE 4.8 LOWCOUNTYSITE CELLSITE TRIGGER · 14-DAY CHECK

4.8Severe Weather Alert Service

⚡ Instant

Site-specific storm warnings before you need to shut down

Expected: Starting from 75 credits per site per month

Runs daily · 4 steps

What it will doChecks the site forecast every day against the weather thresholds you set for the site, and sends an email alert when the 14-day forecast shows one being crossed.

You'll getSite triggers · Daily forecast check · Email alert with the day and the value

Alerts by  Email

Claims & disputes

Most weather analysis happens after the delay. Coming soon: a monthly NEC4 check as the job runs, then the evidence ledger and claim packs to prove what happened when it matters.

Preview: the Contractual Downtime Report · 1mWatch on YouTube →

Coming soon: this report is not in the app yet.

Claims workflows →
Coming soon
WEATHER CLAIM · MONTHLY CHECK 5.1 JFMAMJJASOND1-IN-105 WKTIME BAR

5.1NEC4 Compensation Event Report

⚡ Instant

Check NEC4 weather compensation events before the time bar

Expected: Starting from 450 credits per event

as little as 3 min · 4 steps

What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.

You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme

Output  Word reportConnects to  P6 · Asta

Coming soon
WAS THE WEATHER EXCEPTIONAL? 5.2 FAR ABOVE NORMALNORMAL RANGE

5.2Exceptionally Adverse Weather Report

✓ Reviewed

Prove when the weather was exceptionally adverse

Expected: Starting from 1,500 credits per claim

2–4 days · 4 steps

What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.

You'll getDeparture-from-normal report · Affected-activity schedule · Concurrency notes · JCT/FIDIC-ready pack

Output  Word report · PDF report

Coming soon
WEATHER DELAY · PERIOD BY PERIOD 5.3 W1W2W3W4W5W6WEATHEROTHER

5.3As-Built Weather Delay Report

⚡ Instant

Reconstruct weather delay period by period

Expected: Starting from 2,500 credits per project

as little as 5 min · 3 steps

What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.

You'll getAs-built weather history · Window-by-window delay attribution · Export for TIA / windows analysis

Output  Excel workbookConnects to  P6

Coming soon
THE WEATHER ON THE DAY 5.4 14:20–16:40 UTCRADAR + STATIONS + 45 YRS

5.4Forensic Weather Report

✓ Reviewed

Reconstruct the weather at an exact place and time

Expected: Starting from 1,250 credits per report

1–3 days · 3 steps

What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.

You'll getSite conditions report · Uncertainty statement · Methodology annex

Output  PDF report

Coming soon
STORM VS YOUR POLICY 5.5 POLICY 55 kn68 kn · 1:75 YR

5.5Storm and Flood Claim Evidence Report

✓ Reviewed

Test the storm or flood against the policy definition

Expected: Starting from 950 credits per claim

1–3 days · 4 steps

What it will doTests the event against policy triggers such as named storm, wind speed or flood return period, then packages the meteorological evidence for the adjuster.

You'll getPolicy-trigger test · Event evidence pack · Return-period statement

Output  PDF report

Sustainability & reporting

Physical climate risk now feeds reporting, finance and resilience decisions. Coming soon: numbers that are repeatable, traceable and defensible.

Sustainability workflows →
Coming soon
ENERGY · WITH THE WEATHER TAKEN OUT 6.1 COLD FEBNORMALISEDMETEREDHEATING DEMAND AT THE SITEWEATHER EFFECT −6%

6.1Weather-Normalised Energy Report

⚡ Instant

Separate real energy performance from the weather

Expected: Starting from 350 credits per site per year

as little as 3 min · 3 steps

What it will doWeather-normalises energy use so year-on-year performance reflects efficiency changes rather than a mild winter or cool summer.

You'll getNormalised energy and carbon · Weather-effect split · Year-on-year variance note · SECR-ready tables

Output  Excel workbook · CSV dataConnects to  API

Coming soon
CSRD · CLIMATE RISK BY ASSET 6.2 ACUTECHRONICSHORTMEDIUMLONGHEATWAVEFLOODSTORMSEA LEVELWATER STRESSE1

6.2CSRD Physical Climate Risk Report

✓ Reviewed

Build the physical climate risk section of your CSRD report

Expected: Starting from 1,750 credits per asset

2–5 days · 4 steps

What it will doBuilds asset-level physical climate risk analysis for CSRD, with scenarios, time horizons and methodology documented.

You'll getESRS E1 physical risk tables · Hazard-by-asset matrix · Scenario and horizon coverage · Methodology annex

Output  Excel workbook · Word reportConnects to  API

Coming soon
EU TAXONOMY · CLIMATE CHECK 6.3 HEAT STRESSEXTREME PRECIPITATIONFLOOD (FLUVIAL)MEASUREWINDSTORMDROUGHTSUBSIDENCEPASSES · GREEN

6.3EU Taxonomy Climate Risk Assessment

✓ Reviewed

Run the EU Taxonomy climate risk and vulnerability assessment

Expected: Starting from 1,250 credits per asset

2–4 days · 4 steps

What it will doScreens the asset against the EU Taxonomy climate hazard list and documents the adaptation measures needed for alignment.

You'll getCRVA report · Taxonomy hazard screening · Adaptation measures register · Alignment statement

Output  Word report · Excel workbook

Coming soon
CLIMATE FUTURES · 2025–2100 6.4 SSP1-2.6SSP2-4.5SSP3-7.0SSP5-8.52025205020752100

6.4Climate Scenario Analysis Report

✓ Reviewed

Turn climate scenarios into portfolio numbers

Expected: Starting from 2,500 credits per portfolio

3–6 days · 5 steps

What it will doShows how asset and portfolio exposure changes across climate scenarios and time horizons, with disclosure-ready outputs.

You'll getScenario exposure tables · Portfolio heat map · Horizon comparison · Disclosure-ready narrative

Output  Excel workbookConnects to  API

Coming soon
CARBON COST OF WEATHER DOWNTIME 6.5 WEATHER DOWNTIME184 tCO₂eIDLING · REMOB · REWORKPAS 2080 LINE ITEM

6.5Weather Downtime Carbon Report

⚡ Instant

Measure the carbon cost of weather downtime

Expected: Starting from 500 credits per programme

as little as 4 min · 4 steps

What it will doConverts weather downtime into fuel use and tCO₂e from standing plant, idling, remobilisation, rework and repeat deliveries, against your PAS 2080 baseline.

You'll gettCO₂e from weather downtime · Plant idling breakdown · Rework and remobilisation carbon · PAS 2080 line item

Output  Excel workbookConnects to  P6 · Asta · API

Coming soon
ADAPTATION OPTIONS · RANKED 6.6 RISK REMOVED£RAISE FLOOR LEVELFLOOD BARRIERSDRAINAGE UPSIZECOOL ROOFSHADE CANOPIESRESIDUAL RISK AFTER EACH MEASURE

6.6Climate Adaptation Appraisal

✓ Reviewed

Which adaptation measures reduce the most risk for the cost?

Expected: Starting from 1,500 credits per asset

3–5 days · 4 steps

What it will doCompares adaptation measures against the hazards affecting the asset, showing cost, benefit and residual risk after each measure.

You'll getAdaptation register · Cost and benefit per measure · Residual risk after each · CSRD-ready adaptation plan

Output  Excel workbook · Word report

Coming soon
WATER · WILL IT RUN SHORT? 6.7 DROUGHT TRIGGER1:20 YR DROUGHTAVAILABILITY

6.7Water Stress and Drought Report

⚡ Instant

How exposed is the site to water stress and drought?

Expected: Starting from 500 credits per site

as little as 3 min · 3 steps

What it will doQuantifies current drought, water availability and abstraction-risk exposure from 45 years of history plus future climate signals, formatted for CDP Water and site water plans.

You'll getWater stress baseline · Drought return periods · CDP Water response tables

Output  Excel workbookConnects to  API

Coming soon
ANNUAL RESILIENCE REPORT 6.8 CLIMATE RESILIENCE · FY26DAYS LOST312EVENTS14tCO₂e1.9kYEAR ON YEAR12 SITES · 1 REPORT

6.8Annual Climate Resilience Report

✓ Reviewed

One annual climate resilience report across every site

Expected: Starting from 2,500 credits per year

3–5 days · 3 steps

What it will doBrings the year's weather, downtime, events and near-misses across the portfolio into one board-ready resilience report.

You'll getPortfolio resilience report · Weather events with costs · Downtime and carbon totals · Year-on-year trend

Output  Word report · Excel workbookConnects to  API

Coming soon
HEAT · IS IT SAFE TO WORK? 6.9 HEAT STRESS31.4°CHEAVY WORK · ACCLIMATISEDWORK 45REST 15TEMP · HUMIDITYRADIANT · WIND

6.9Heat Stress Monitor

⚡ Instant

Is heat stress affecting safe working time?

Expected: Starting from 75 credits per site per month

Runs daily · 4 steps

What it will doCombines temperature, humidity, solar radiation and wind to estimate heat stress and produce shift-level work-rest guidance.

You'll getHeat stress forecast · Work-rest schedule · Exceedance days per year · Workforce exposure log

Alerts by  SMS · Email

Why the weather statistic should come from the site, not the nearest station

A weather station describes conditions where the station stands. That may be an airport, coastal site or hilltop kilometres from the works, at a different elevation, and the record may contain gaps or end when the station moves or closes.

The data can be accurate for the station without being representative of the project.

WeatherWise uses 45 years of world-leading reanalysis datasets, up to 9 km grid, to reconstruct hourly weather at the project location across more than 80 variables, with construction thresholds already calculated.

Where a contract names a weather station, WeatherWise shows the site and station side by side. Our methodology explains how grid values are checked against observations.

How the data is built and checked →
ComparedNearest weather station reportWeatherWise at the site
Distance from siteWherever the nearest recording station is, which can be tens of kilometres from the worksThe reanalysis grid cell that contains the site
Elevation matchThe station's own height, which may differ from the site'sThe grid cell's terrain height, not the site's own; where terrain matters, specialist topographic data can refine temperature to about 90 metres
Record lengthDepends on the station; records can have gaps, or end when a station moves or closes45 years, continuous and gap-free
VariablesOnly what that station measures80+ variables, with construction thresholds pre-computed
Update frequencyA snapshot at the date the report was issued; a new report has to be ordered to update itMonthly: each month is validated and added by about the 5th of the next

Real results from real projects

BAMMorgan SindallSkanskaKierBalfour BeattyStory ContractingGrahamSacyrEllisDonNational Grid
SMP Alliance — Morgan Sindall + United Utilities

Weather risk standardised across 100+ water infrastructure projects

Workflows used: Weather downtime allowance

Morgan Sindall multi-sector rollout

34% of time risk attributed to weather across 15 projects

Workflows used: Weather downtime allowance · Live weather calendars

Moosonee Healthcare — Pomerleau

108 additional risk days identified; P80 moved four months

Workflows used: QSRA weather risk

Chris McGinness, BAM UK & Ireland: how the team uses WeatherWise · 5m25sWatch on YouTube →
“EHAB is integral to our risk management, guiding decision-making from preconstruction through delivery. Saves days of manual weather analysis.”
Chris McGinnessChris McGinnessLead Planning Manager, BAM

Works with the tools you already plan in

Frequently asked questions

Can't find the workflow you need? Email sales@ehab.co and we'll point you to the fastest route.

How does the marketplace work?

Sign up with 1,000 credits. Pick a workflow and add what it asks for — a site pin, programme or contract date. Credits are only deducted when you confirm, and the price is shown before you run it.

What can I run with 1,000 credits?

Your 1,000 free credits cover a first run of many workflows. The price is on each workflow card, in credits. Some larger reports cost more than 1,000 credits, and the app shows the exact price before you confirm anything.

Which scheduling and risk tools does it connect to?

Oracle Primavera P6, Asta Powerproject, Oracle Primavera Cloud, Safran Risk, Deltek Acumen Risk, Nodes & Links. Calendars and risk distributions export directly; evidence packs are coming soon. Programmes can also be imported from Microsoft Project as .mpp files.

How accurate is it?

92.3% agreement with observed conditions across 400+ projects. Models run on 45+ years of world-leading reanalysis datasets, up to 9 km grid, 80+ variables, calibrated to construction thresholds.

What do "Instant" and "Reviewed" mean on a card?

Instant cards run fully automatically, with results in as little as a few minutes. Reviewed cards run automatically, then an EHAB analyst checks the output before it is released, so results take 1–6 days depending on the workflow. Each card shows its own turnaround.

Is EHAB an insurer?

No. WeatherWise provides weather data and analysis; it does not underwrite insurance risk. Ehabitation Ltd is an Appointed Representative of Gateway Platform Services Limited (FCA FRN 790558).

Which UK contracts does WeatherWise support for weather claims?

Today WeatherWise supports the weather provisions of NEC4 by setting the Contract Data weather baseline. The monthly clause 60.1(13) compensation event check is coming soon. For JCT (Relevant Event: exceptionally adverse weather) and FIDIC Red Book sub-clause 8.4(c) (1999) or 8.5(c) (2017), the exceptionally adverse weather evidence pack, coming soon, will compare the claim period with the site's 45-year record. The workflows are built for NEC4; for an NEC3 contract, email sales@ehab.co before relying on them.

Is the data suitable for use in a formal extension-of-time claim?

Yes, as evidence. WeatherWise data is documented, reproducible and tied to the exact site, so it can support an extension-of-time claim. Whether the claim succeeds is for the contract administrator, adjudicator or tribunal to decide. Where the contract names a weather station or data source, that source governs entitlement, and WeatherWise shows how it compares with the site. Reviewed outputs are signed off by an EHAB analyst. WeatherWise does not provide expert testimony.

Start free with 1,000 credits.

No card required. In the app, every workflow shows its price before you run it, and nothing runs without your confirmation.