Weather Downtime Allowance Report3.1⚡ Instant

How much weather should your bid allow?

The number that decides if the job is profitable. Set from 45 years at the site.

A weather downtime allowance is the number of working days a construction programme expects to lose to weather, by activity type and by month. WeatherWise sets it by importing your programme (.xer, .pp or .mpp), classifying the weather-sensitive activities, applying trade-specific thresholds, running 45 years of site weather through a Monte Carlo simulation, and generating P20, P50 and P80 downtime calendars to import into P6 or Asta or to sync into Primavera Cloud, or downtime samples for Safran Risk — with the audit trail that shows how the number was reached.

Starting from 1,500 credits per programme

Start on your 1,000 free credits; this workflow is priced from 1,500 credits.

YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS
as little as 4 min · 5 stepsDowntime calendars by activity type

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesSetting a weather downtime allowance by hand takes 2 to 10 planner days and costs £1,000 to £8,000 today. It relies on limited weather data that is hard to find, may be out of date and has to be worked through by hand, which is slow and error-prone, and it leaves no audit trail.Imports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.
Time and cost2–10 planner days · £1,000–£8,000 · limited, hard-to-use data · no audit trailAs little as 4 min · 5 steps · ⚡ Instant · up to 720× fasterStart on your 1,000 free credits; this workflow is priced from 1,500 credits. The exact price shows in the app before you confirm.

By-hand figures are EHAB market benchmarks. Where they come from.

Already using activity codes

We use them as they are.

If your programme already carries activity codes, WeatherWise reads them straight in, maps the weather-sensitive work and runs. The times above assume this.

Starting from scratch

We'll set them up with you, once.

No activity codes yet? We help you build the structure one time. After that, you run as many programmes through the system as you like.

Video: Analyse your schedule with the Plan Impact Summary

Analyse your schedule with the Plan Impact Summary · 3m48sWatch on YouTube →

Weather downtime allowance: how it's done today

Somewhere in the next tender, a planner will spend two days deciding how much weather to allow for. They'll work it out by hand from whatever data they can find: a regional average, a previous project, or an operations manager's recollection of a similar site. It will govern the largest single exposure on a two-year programme. It will leave no audit trail. And commercial review will strip half of it out to win the job.

Today, a planner sets the tender weather allowance by judgement, in five steps.

  1. Pick the weather-sensitive activities in the tender programme.
  2. Estimate by hand the percentage of working time each activity will lose to weather, from whatever weather data can be found.
  3. Add weather non-working days to a calendar, or a buffer bar, or nothing.
  4. Price the weather allowance into the tender.
  5. Defend the weather allowance in bid review with only limited data behind it.

What WeatherWise does instead

Upload the programme. We classify every weather-sensitive activity, apply trade-specific thresholds — wind speed for lifts, substrate temperature for pours, antecedent rainfall for earthworks — run 45 years of site weather through Monte Carlo, and generate the weather calendars for you to import into P6 or Asta, or sync them into OPC. You get P20, P50 and P80 lost days per activity type, month by month, with the evidence attached. When bid review challenges the allowance, you show them the distribution.

Automating AACE 84R-13: planning and accounting for adverse weather · 3m26sWatch on YouTube →

How is it calculated?

WeatherWise uses 45 years of world-leading reanalysis datasets, up to 9 km grid, for the site. It classifies the weather-sensitive activities in the imported programme and applies a trade-specific threshold to each, such as wind speed for lifts, substrate temperature for pours and antecedent rainfall for earthworks. A Monte Carlo simulation then runs the programme repeatedly against the 45 years of site weather to build a distribution of lost days for each activity type and month, from which P20, P50 and P80 are read. As an Instant workflow, results pass automated checks and can return in as little as a few minutes, with the thresholds and inputs recorded in the audit trail. Full method: see our method page.

What you get

  • Downtime calendars by activity type
  • P20/P50/P80 lost days
  • Month-by-month exposure
  • Audit trail

Connects to  P6 · Asta · OPC · Safran

Who is this for?

Planners and schedulers

The calendar logic for the tender programme, activity by activity, defensible when the client asks.

Estimators

The lost-day count behind prelims and weather risk pricing, at the confidence level the bid strategy needs.

Quantity surveyors and commercial managers

The baseline that later programme re-runs (4.1) and any claim (5.1 and 5.2, coming soon) will be compared with.

Risk managers

The P-values that feed the QSRA (3.2) and the weather exposure the project retains.

More for: Planners and schedulers · Estimators

Standards and contracts referenced

Proof

400+ projects. £50bn+ of infrastructure. Morgan Sindall attributed 34% of time risk to weather across 15 projects and had clients accept it for the first time.

Priced from 1,500 credits. Results in as little as 4 minutes.

Sign up free with 1,000 credits and no card. The exact price shows in the app before you confirm.

Running it across a division? See credit packs →

Questions about weather downtime allowance

Can't find it? Email sales@ehab.co.

How much weather should a UK tender programme allow?

There is no single right figure: a UK tender programme should allow the weather downtime its own activities are likely to lose at its own site, in the months they are programmed. A weather downtime allowance is the number of working days a construction programme expects to lose to weather, by activity type and by month. WeatherWise sets it from 45 years of site weather and gives P20, P50 and P80 lost days, so the bid team can choose the confidence level.

What is the difference between P50 and P80 downtime?

P50 downtime is the number of weather-lost days that half of the simulated years stay within; P80 downtime is the number that four years in five stay within. P80 is therefore higher and more cautious. WeatherWise produces both, with P20, from a Monte Carlo simulation of the programme over 45 years of site weather, so the allowance can be set at the confidence the bid strategy needs.

Which activities are weather-sensitive and what thresholds apply?

Weather-sensitive activities are those that stop or slow when a weather condition crosses a limit, such as crane lifts, concrete pours, earthworks and external finishes. WeatherWise classifies them from the imported programme and applies trade-specific thresholds, for example wind speed for lifts, substrate temperature for pours and antecedent rainfall for earthworks. The thresholds used for each activity are recorded in the audit trail.

Can the calendars be imported into Primavera P6 and Asta Powerproject?

Yes. WeatherWise generates the weather downtime calendars for you to import into Primavera P6 and Asta Powerproject, and syncs them directly into Oracle Primavera Cloud: one calendar for each weather-sensitive activity type, with the days expected to be lost to weather marked as non-working. It reads the programme as a P6 .xer, Asta .pp or MS Project .mpp file. For Safran Risk, it exports weather downtime samples instead.

How does the allowance relate to the NEC contract weather line?

The weather downtime allowance covers the weather the contractor carries; the NEC contract weather line marks where the client starts to carry it. Under NEC4 clause 60.1(13), weather is a compensation event only when a measurement in a calendar month occurs on average less than once in ten years, and only the difference above that line counts. Weather below the line stays with the contractor, so it belongs in the allowance.

Was this the method adopted on the SMP Alliance?

In part. On the SMP Alliance, Morgan Sindall Infrastructure and United Utilities used WeatherWise to standardise weather risk management across more than 100 water infrastructure projects, and one weather calendar method was applied to every project for consistent weather contingency estimates. The SMP Alliance case study sets out how.

What if my programme has no activity codes?

WeatherWise runs quickest when the programme already carries activity codes. If yours does not, the EHAB team helps you set them up once, as part of onboarding; after that every programme runs straight through. Buy onboarding and support, or email sales@ehab.co and we will work out what you need.

Often run with the Weather Downtime Allowance Report

RISK MODEL · REAL WEATHER 3.2 P80+4 MONTHSONE GUESSREAL WEATHER

3.2QSRA Weather Risk Model

✓ Reviewed

Put realistic weather risk into your QSRA

Starting from 2,250 credits per programme

1–2 days · 4 steps

What it doesReplaces a single generic weather assumption with linked weather risk distributions for the activities actually exposed.

You getWeather risk distributions · Correlation structure · P50/P80 dates · Tornado contribution

Connects to  Safran · Acumen · PRA · OPC · N&L

WEATHER RISK · RE-RUN ON THE UPDATE 4.1 BAD JANUARYOCTNOVDECJANFEBMARAPRMAYJUNP80P50

4.1Live Weather Calendar Service

⚡ Instant

Is your programme still on the tender weather calendars?

Starting from 100 credits per site per month

On demand · 4 steps

What it doesRe-runs the weather risk on each programme update you import and generates fresh weather calendars to import into P6 or Asta, or syncs them into OPC, on demand.

You getRefreshed weather calendars · Revised P50/P80 completion · Calendars for P6, Asta and OPC

Connects to  P6 · Asta · OPC

CONTRACT WEATHER LINE · NEC 3.3 RAIN>5MMFROSTSNOWJFMAMJJASOND31 km · +84 mSTN

3.3NEC Contract Weather Baseline

⚡ Instant

Set the NEC weather baseline for the site

Starting from 350 credits per contract

as little as 2 min · 4 steps

What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.

You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options

Output  PDF report

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.