Weather delay claim evidence for NEC4, JCT and FIDIC contracts, coming soon

Coming soon: the evidence, already assembled.

NEC4, JCT and FIDIC weather evidence, built during the job — not eighteen months late.

Claims is the only phase where the industry pays properly for weather analysis, eighteen months late and through a legal budget. WeatherWise will check each month's weather against the NEC4 contract weather data before the notification period closes, and add exceptionally adverse weather packs for JCT and FIDIC that compare the claim period with the site's long-term record and link it to the activities it stopped, as-built weather delay histories for the delay expert, and forensic reconstruction of the weather at an exact place and time.

Fair or flawed? Weather risk and NEC contracts (webinar) · 56m37sWatch on YouTube →

Claims & disputes workflows

Most weather analysis happens after the delay. Coming soon: a monthly NEC4 check as the job runs, then the evidence ledger and claim packs to prove what happened when it matters.

Preview: the Contractual Downtime Report · 1mWatch on YouTube →

Coming soon: this report is not in the app yet.

Showing 5 of 5 workflows

Workflow types

⚡ InstantWill run automatically, with results in as little as a few minutes.

✓ ReviewedWill be checked by an EHAB analyst before release, with results in 1–6 days, depending on the workflow.

Coming soon
WEATHER CLAIM · MONTHLY CHECK 5.1 JFMAMJJASOND1-IN-105 WKTIME BAR

5.1NEC4 Compensation Event Report

⚡ Instant

Check NEC4 weather compensation events before the time bar

Expected: Starting from 450 credits per event

as little as 3 min · 4 steps

What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.

You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme

Output  Word reportConnects to  P6 · Asta

Coming soon
WAS THE WEATHER EXCEPTIONAL? 5.2 FAR ABOVE NORMALNORMAL RANGE

5.2Exceptionally Adverse Weather Report

✓ Reviewed

Prove when the weather was exceptionally adverse

Expected: Starting from 1,500 credits per claim

2–4 days · 4 steps

What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.

You'll getDeparture-from-normal report · Affected-activity schedule · Concurrency notes · JCT/FIDIC-ready pack

Output  Word report · PDF report

Coming soon
WEATHER DELAY · PERIOD BY PERIOD 5.3 W1W2W3W4W5W6WEATHEROTHER

5.3As-Built Weather Delay Report

⚡ Instant

Reconstruct weather delay period by period

Expected: Starting from 2,500 credits per project

as little as 5 min · 3 steps

What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.

You'll getAs-built weather history · Window-by-window delay attribution · Export for TIA / windows analysis

Output  Excel workbookConnects to  P6

Coming soon
THE WEATHER ON THE DAY 5.4 14:20–16:40 UTCRADAR + STATIONS + 45 YRS

5.4Forensic Weather Report

✓ Reviewed

Reconstruct the weather at an exact place and time

Expected: Starting from 1,250 credits per report

1–3 days · 3 steps

What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.

You'll getSite conditions report · Uncertainty statement · Methodology annex

Output  PDF report

Coming soon
STORM VS YOUR POLICY 5.5 POLICY 55 kn68 kn · 1:75 YR

5.5Storm and Flood Claim Evidence Report

✓ Reviewed

Test the storm or flood against the policy definition

Expected: Starting from 950 credits per claim

1–3 days · 4 steps

What it will doTests the event against policy triggers such as named storm, wind speed or flood return period, then packages the meteorological evidence for the adjuster.

You'll getPolicy-trigger test · Event evidence pack · Return-period statement

Output  PDF report

Who is this phase for?

  • Quantity surveyors and commercial managers notifying and quantifying events
  • Claims consultants and delay analysts
  • Contract administrators and project managers assessing claims
  • Construction lawyers preparing or defending a dispute
  • Insurers and loss adjusters checking a storm against a policy definition

Standards and contracts in this phase

Questions about claims & disputes

What counts as exceptionally adverse weather under JCT?

JCT does not define it. In practice, weather is exceptionally adverse when it is significantly worse than the long-term norm for that location and time of year, judged at the time the affected work was actually carried out (Walter Lawrence v Commercial Union, 1984), and it must have delayed completion. Under JCT it is a Relevant Event (exceptionally adverse weather), giving an extension of time but not loss and expense. The WeatherWise exceptionally adverse weather pack (coming soon) will compare the claim period with the site's 45-year record.

How is a weather compensation event measured under NEC4?

Under NEC4 clause 60.1(13), a weather measurement recorded within a calendar month, before the Completion Date for the whole of the works, at the place stated in the Contract Data, is a compensation event if the weather data show it occurs on average less frequently than once in ten years. Only the difference between the recorded value and the 1-in-10-year value counts. The WeatherWise NEC4 weather compensation event check (coming soon) will run this check every month for every measurement and count down the notification period.

Will the WeatherWise evidence pack be accepted by contract administrators and adjudicators?

The WeatherWise exceptionally adverse weather pack (coming soon) will be built to be examined, not taken on trust: it will document the data source, the method and each calculation, so another analyst can reproduce the result. Whether it is accepted in a particular claim or dispute is for the contract administrator, adjudicator or tribunal to decide. Where the contract names a weather station or data source, that source governs entitlement, and the pack will show how it compares with the site.