Weather delay claim evidence for NEC4, JCT and FIDIC contracts, coming soon
Coming soon: the evidence, already assembled.
NEC4, JCT and FIDIC weather evidence, built during the job — not eighteen months late.
Claims is the only phase where the industry pays properly for weather analysis, eighteen months late and through a legal budget. WeatherWise will check each month's weather against the NEC4 contract weather data before the notification period closes, and add exceptionally adverse weather packs for JCT and FIDIC that compare the claim period with the site's long-term record and link it to the activities it stopped, as-built weather delay histories for the delay expert, and forensic reconstruction of the weather at an exact place and time.
Claims & disputes workflows
Most weather analysis happens after the delay. Coming soon: a monthly NEC4 check as the job runs, then the evidence ledger and claim packs to prove what happened when it matters.
Coming soon: this report is not in the app yet.
Showing 5 of 5 workflows
Workflow types
⚡ InstantWill run automatically, with results in as little as a few minutes.
✓ ReviewedWill be checked by an EHAB analyst before release, with results in 1–6 days, depending on the workflow.
5.1NEC4 Compensation Event Report
⚡ InstantCheck NEC4 weather compensation events before the time bar
Expected: Starting from 450 credits per event
What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.
You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme
Output Word reportConnects to P6 · Asta
5.2Exceptionally Adverse Weather Report
✓ ReviewedProve when the weather was exceptionally adverse
Expected: Starting from 1,500 credits per claim
What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.
You'll getDeparture-from-normal report · Affected-activity schedule · Concurrency notes · JCT/FIDIC-ready pack
Output Word report · PDF report
5.3As-Built Weather Delay Report
⚡ InstantReconstruct weather delay period by period
Expected: Starting from 2,500 credits per project
What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.
You'll getAs-built weather history · Window-by-window delay attribution · Export for TIA / windows analysis
Output Excel workbookConnects to P6
5.4Forensic Weather Report
✓ ReviewedReconstruct the weather at an exact place and time
Expected: Starting from 1,250 credits per report
What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.
You'll getSite conditions report · Uncertainty statement · Methodology annex
Output PDF report
5.5Storm and Flood Claim Evidence Report
✓ ReviewedTest the storm or flood against the policy definition
Expected: Starting from 950 credits per claim
What it will doTests the event against policy triggers such as named storm, wind speed or flood return period, then packages the meteorological evidence for the adjuster.
You'll getPolicy-trigger test · Event evidence pack · Return-period statement
Output PDF report
No workflow matches that yet.
Tell us what you need and we'll build the card. Email sales@ehab.co.
Who is this phase for?
- Quantity surveyors and commercial managers notifying and quantifying events
- Claims consultants and delay analysts
- Contract administrators and project managers assessing claims
- Construction lawyers preparing or defending a dispute
- Insurers and loss adjusters checking a storm against a policy definition
Standards and contracts in this phase
- NEC4 ECC 60.1(13), 61.3, 62
- JCT Relevant Events, including exceptionally adverse weather
- FIDIC Red Book sub-clause 8.4(c) (1999) or 8.5(c) (2017)
- SCL Delay and Disruption Protocol 2nd edition
- Walter Lawrence v Commercial Union (1984) on assessing weather at the time work was carried out.
Questions about claims & disputes
What counts as exceptionally adverse weather under JCT?
How is a weather compensation event measured under NEC4?
Will the WeatherWise evidence pack be accepted by contract administrators and adjudicators?
Start free with 1,000 credits.
No card required. In the app, every workflow shows its price before you run it, and nothing runs without your confirmation.
Running it across a division? See credit packs →