New: 40 weather workflows across the construction lifecycle. Sign up and get 1,000 credits. See sustainability & reporting →

Weather and climate workflows for developers and asset owners

Know the weather before you buy.

Site weather at option stage, with flood and climate screening coming soon — before the consultant is commissioned.

Developers pay for weather at feasibility through consultant studies built on the nearest station, and again when funders ask for climate due diligence on each asset. WeatherWise by EHAB gives a 45-year weather record at the site for the planning statement and lender pack today. Flood risk screening before an assessment is commissioned, and physical climate hazard baselines per asset in the structure ISO 14091 describes, are coming soon.

Where developers and asset owners start

Coming soon
FLOOD SCREEN · 5 LAYERS · CLIMATE UPLIFT 1.1 SITEFZ3FZ2FRA · STANDARD

1.1Flood Risk Screening Report

⚡ Instant

Does this site need a flood risk assessment?

Expected: Starting from 450 credits per site

as little as 3 min · 3 steps

What it will doScreens the site boundary for fluvial, surface water, groundwater, reservoir and sewer flood risk, applies the current climate uplift, and flags whether a full FRA is required.

You'll getFlood screening report · Zone and layer maps · FRA scope recommendation

Output  PDF reportConnects to  API

45 YRS · YOUR GRID CELL · 80+ VARIABLES W.1 1979LATEST MONTHDAYS > 5 MM · FROST · WIND > 20 M/S

W.1Site Weather History Report

⚡ Instant

45 years of site weather, ready to use

Starting from 150 credits per site download

as little as 2 min · 3 steps

What it doesShows 45 years of daily rain, wind, frost, heat and other weather at your site, as the full record, a typical year and monthly statistics.

You get45-year daily record · Typical-year percentiles · Monthly statistics

Coming soon
CLIMATE HAZARDS · NOW TO 2100 1.4 NOW203020502100HEATCOLDRAINWINDDROUGHTFLOOD

1.4Climate Hazard Baseline Report

✓ Reviewed

See the site's climate risk now to 2100

Expected: Starting from 950 credits per asset

1–3 days · 4 steps

What it will doShows exposure to heat, cold, heavy rain, wind, drought and flood today — and how it changes by 2030, 2050 and 2100.

You'll getHazard baseline pack · Change signals by scenario · ISO 14091-ready evidence tables

Output  Excel workbookConnects to  API

All workflows for developers and asset owners

Coming soon
SITE WEATHER RISK SCAN · 7 ACTIVITIES W.2 EARTHWORKSCONCRETELIFTINGSTEELWORKROOFINGSURFACINGCOATINGSJFMAMJJASOND

W.2Site Weather Risk Scan

⚡ Instant

Which weather will delay this job?

as little as 2 min · 2 stepsPortfolio pricing

What it will doChecks the site against the weather limits of the main construction activities and rates each one, month by month, by how much weather is likely to stop it.

You'll getOne-page site risk summary · Activity-by-month risk heatmap · Worst months by activity · Recommended next workflows

Output  PDF report · Excel workbookConnects to  API

Coming soon
RAINFALL · HOW HARD, HOW OFTEN 1.2 1:100 + 40%CURRENTOLD FIGURESDURATION →mm/h

1.2Drainage Design Rainfall Report

⚡ Instant

Use the right rainfall figures for drainage design

Expected: Starting from 175 credits per site

as little as 3 min · 3 steps

What it will doReturns the rainfall figures needed for drainage design using current climate allowances, and flags when national baselines have been superseded.

You'll getRainfall input pack · Climate uplift applied · Superseded-baseline flag

Output  CSV dataConnects to  API

Coming soon
WIND AT YOUR SITE · BY DIRECTION 1.3 N< 5 m/s5–10 m/s> 10 m/sPREVAILING SW

1.3Site Wind Climate Report

⚡ Instant

How windy is the site — and from which direction?

Expected: Starting from 350 credits per site

as little as 3 min · 3 steps

What it will doShows wind speed, frequency and direction at the site, giving your design team or wind consultant a site-specific baseline.

You'll getWind rose · Directional exceedance tables · Roughness notes

Output  CSV data

Coming soon
CLIMATE ALLOWANCE WATCH · MONTHLY 2.5 REV 2026A66 · RIVER EDENAFFECTEDM4 J12 · THAMESHS2 · COLNEAFFECTEDSOLENT HUB

2.5Climate Allowance Monitor

⚡ Instant

Know when updated climate guidance affects a live design

Expected: Starting from 25 credits per project per month

Runs monthly · 3 steps

What it will doMonitors regulator guidance and flags live designs affected by changes in hazard, river basin or asset lifetime assumptions.

You'll getChange alert · Affected-project list · Re-run checklist

Alerts by  EmailConnects to  API

Coming soon
CSRD · CLIMATE RISK BY ASSET 6.2 ACUTECHRONICSHORTMEDIUMLONGHEATWAVEFLOODSTORMSEA LEVELWATER STRESSE1

6.2CSRD Physical Climate Risk Report

✓ Reviewed

Build the physical climate risk section of your CSRD report

Expected: Starting from 1,750 credits per asset

2–5 days · 4 steps

What it will doBuilds asset-level physical climate risk analysis for CSRD, with scenarios, time horizons and methodology documented.

You'll getESRS E1 physical risk tables · Hazard-by-asset matrix · Scenario and horizon coverage · Methodology annex

Output  Excel workbook · Word reportConnects to  API

Coming soon
EU TAXONOMY · CLIMATE CHECK 6.3 HEAT STRESSEXTREME PRECIPITATIONFLOOD (FLUVIAL)MEASUREWINDSTORMDROUGHTSUBSIDENCEPASSES · GREEN

6.3EU Taxonomy Climate Risk Assessment

✓ Reviewed

Run the EU Taxonomy climate risk and vulnerability assessment

Expected: Starting from 1,250 credits per asset

2–4 days · 4 steps

What it will doScreens the asset against the EU Taxonomy climate hazard list and documents the adaptation measures needed for alignment.

You'll getCRVA report · Taxonomy hazard screening · Adaptation measures register · Alignment statement

Output  Word report · Excel workbook

Coming soon
ADAPTATION OPTIONS · RANKED 6.6 RISK REMOVED£RAISE FLOOR LEVELFLOOD BARRIERSDRAINAGE UPSIZECOOL ROOFSHADE CANOPIESRESIDUAL RISK AFTER EACH MEASURE

6.6Climate Adaptation Appraisal

✓ Reviewed

Which adaptation measures reduce the most risk for the cost?

Expected: Starting from 1,500 credits per asset

3–5 days · 4 steps

What it will doCompares adaptation measures against the hazards affecting the asset, showing cost, benefit and residual risk after each measure.

You'll getAdaptation register · Cost and benefit per measure · Residual risk after each · CSRD-ready adaptation plan

Output  Excel workbook · Word report

Standards developers and asset owners work to

Questions from developers and asset owners

Should a client set the NEC weather data from the site or a station?

It is the client's choice when drafting the Contract Data, and it decides how weather risk is shared. A station that is unrepresentative of the site can shift risk in ways neither party intended and invites dispute later. WeatherWise compares the site's 45-year record with candidate stations month by month, so the client can choose the place and data with the difference visible to both sides.

What climate risk evidence do funders ask for?

Funders typically ask for site-level evidence of physical climate hazards such as flood, heat, extreme rainfall, wind and drought, covering current exposure and projected change. Requirements vary by lender, and green-labelled finance may require EU Taxonomy screening. The WeatherWise climate hazard baseline (coming soon) will set out each hazard at the asset from 45 years of record, with projected change to 2030, 2050 and 2100.

Can one dataset cover a whole portfolio?

Yes. WeatherWise uses the same 45-year record and method at every site, so a portfolio's weather figures are directly comparable, which a set of reports from different consultants rarely is. Its flood and climate figures will be too, once those workflows launch (coming soon). The method is documented and fixed, so figures reconcile from one year's reporting to the next, and any change to the method is recorded in the version history on the method page.

Start free with 1,000 credits.

No card required. In the app, every workflow shows its price before you run it, and nothing runs without your confirmation.

Running it across a division? See credit packs →