Weather downtime allowance, contract baseline and QSRA weather risk for tenders

Price the weather properly.

Allowance, QSRA driver and contract baseline — set with site evidence, not limited data worked by hand.

Weather becomes time and money at tender. The downtime allowance, the QSRA weather driver, the contract weather baseline and the decision to protect or reprogramme are the largest single exposure on most projects and are usually set in a day with no audit trail. WeatherWise quantifies the first three from 45 years of weather at the site, produces the calendars and distributions for the planning and risk tools, and keeps the evidence for the claim that may follow; weather mitigation costing, for the protect-or-reprogramme decision, is coming soon.

The pre-construction weather myth (webinar) · 48m35sWatch on YouTube →

Bid, tender & contract workflows

This is where weather becomes time and money. Set the allowance, contract baseline and risk model with an auditable method.

Already using activity codes? WeatherWise reads them straight in. If not, we'll help set them up once so future programmes run straight through. Onboarding & support →

Showing 5 of 5 workflows

Workflow types

⚡ InstantRuns automatically, with results in as little as a few minutes.

✓ ReviewedChecked by an EHAB analyst before release. Results in 1–6 days, depending on the workflow.

YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS

3.1Weather Downtime Allowance Report

⚡ Instant

How much weather should you allow in the bid?

Starting from 1,500 credits per programme

as little as 4 min · 5 steps

What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.

You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail

Connects to  P6 · Asta · OPC · Safran

RISK MODEL · REAL WEATHER 3.2 P80+4 MONTHSONE GUESSREAL WEATHER

3.2QSRA Weather Risk Model

✓ Reviewed

Put realistic weather risk into your QSRA

Starting from 2,250 credits per programme

1–2 days · 4 steps

What it doesReplaces a single generic weather assumption with linked weather risk distributions for the activities actually exposed.

You getWeather risk distributions · Correlation structure · P50/P80 dates · Tornado contribution

Connects to  Safran · Acumen · PRA · OPC · N&L

CONTRACT WEATHER LINE · NEC 3.3 RAIN>5MMFROSTSNOWJFMAMJJASOND31 km · +84 mSTN

3.3NEC Contract Weather Baseline

⚡ Instant

Set the NEC weather baseline for the site

Starting from 350 credits per contract

as little as 2 min · 4 steps

What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.

You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options

Output  PDF report

Coming soon
MITIGATION vs REPROGRAMME 3.4 P(FROST) 34%ENCAPSULATE + HEATMOVE TO SPRINGPROB-WEIGHTED £

3.4Weather Mitigation Appraisal

⚡ Instant

Protect the work or reprogramme it?

Expected: Starting from 600 credits per programme

as little as 4 min · 5 steps

What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.

You'll getDecision table · Probability-weighted cost per option · Preferred option

Output  Excel workbook · PDF report

Coming soon
OFFSHORE · WORKABLE WINDOWS 3.5 JFMAMJJASONDWAIT ON WEATHER 18–31 DAYS

3.5Weather Window Analysis

✓ Reviewed

Price wait-on-weather before the campaign starts

Expected: Starting from 3,500 credits per campaign

3–5 days · 5 steps

What it will doRuns your offshore campaign against every year on record to show workable windows, waiting time and campaign duration by month.

You'll getWindow distribution by month · P50/P90 campaign duration · WoW day allowance · Vessel-cost exposure

Output  Excel workbook

Who is this phase for?

  • Planners and schedulers building the tender programme
  • Estimators pricing preliminaries and weather risk
  • Quantity surveyors and commercial managers setting or reviewing the contract weather line
  • Risk managers running QSRA

Standards and contracts in this phase

Questions about bid, tender & contract

How much weather should a tender programme allow?

There is no single figure: the right allowance depends on the site, the season and the weather-sensitive activities in the programme. It should be set by activity and by month from the site's long-term record, at a stated confidence such as P50 or P80. WeatherWise does this by running the programme against 45 years of weather at the site and returning P20, P50 and P80 lost days, with the audit trail that shows how each figure was reached.

What is the NEC weather measurement and how is the 1-in-10 line set?

The NEC4 Contract Data names the place where weather is measured, the measurements used — typically cumulative rainfall, days with more than 5 mm of rain, days with minimum air temperature below 0 °C and days with snow lying — and the source of the weather data. For each calendar month, the 1-in-10 line is the value that data shows occurring on average once in ten years. WeatherWise sets the line from the site's 45-year record and compares it with the named station.

Can the downtime calendars be imported into Primavera P6?

Yes. WeatherWise generates P20, P50 and P80 weather downtime calendars for you to import into Oracle Primavera P6 and Asta Powerproject, and syncs them directly into Oracle Primavera Cloud; for Safran Risk it exports weather downtime samples. The programme is imported as an .xer, .pp or .mpp file, the weather-sensitive activities are classified, and the calendars come back with the audit trail showing how each lost day was reached, so the client can follow the logic.