QSRA Weather Risk Model3.2✓ Reviewed

Put real weather in your risk model.

Replace the one-line weather estimate in your QSRA. Watch the P80 move.

Most quantitative schedule risk analyses carry weather as a single three-point estimate on one line. WeatherWise replaces it with activity-linked weather risk distributions derived from 45 years at the site, correlated across activities that share the same weather, and exports them to Safran Risk, Deltek Acumen Risk and Primavera Risk Analysis.

Starting from 2,250 credits per programme

Start on your 1,000 free credits; this workflow is priced from 2,250 credits.

RISK MODEL · REAL WEATHER 3.2 P80+4 MONTHSONE GUESSREAL WEATHER
1–2 days · 4 stepsWeather risk distributions

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesEach quantitative risk analysis cycle costs £8,000 to £60,000 today. Weather is usually modelled in it as one range, with no correlation to anything else.Replaces a single generic weather assumption with linked weather risk distributions for the activities actually exposed.
Time and cost£8,000–£60,000 per QRA cycle · weather modelled as one uncorrelated range1–2 days · 4 steps · ✓ ReviewedStart on your 1,000 free credits; this workflow is priced from 2,250 credits. The exact price shows in the app before you confirm.

By-hand figures are EHAB market benchmarks. Where they come from.

Already using activity codes

We use them as they are.

If your programme already carries activity codes, WeatherWise reads them straight in, maps the weather-sensitive work and runs. The times above assume this.

Starting from scratch

We'll set them up with you, once.

No activity codes yet? We help you build the structure one time. After that, you run as many programmes through the system as you like.

Video: Integrating WeatherWise calendars into Safran Risk

Integrating WeatherWise calendars into Safran Risk · 10m20sWatch on YouTube →

QSRA weather risk: how it's done today

In most schedule risk analyses, weather enters as a single three-point range elicited in a workshop, with no correlation to anything. A cold January hits the pours, the lifts, the earthworks and the external finishes at once. Modelling that as independent events understates the tail — which is exactly the part the P80 is supposed to capture.

Today, weather enters most schedule risk models as a single workshop estimate, in four steps.

  1. Workshop a single weather range with the project team.
  2. Type the weather range into Safran or Acumen as one uncorrelated line.
  3. Run the schedule risk simulation.
  4. Report a P80 date that everyone quietly knows is optimistic.

What WeatherWise does instead

We build activity-specific QSRA weather distributions from 45 years at the site, with the correlation structure between activities preserved, and push them into your risk tool. The tornado chart shows weather's real contribution. The P80 moves — usually later. Better to find that out in the bid than in month fourteen.

Pomerleau × EHAB × Safran: weather risk in Northern Ontario (webinar) · 53m8sWatch on YouTube →

How is it calculated?

WeatherWise uses 45 years of world-leading reanalysis datasets, up to 9 km grid, for the site. For each weather-sensitive activity it applies the relevant threshold and builds a distribution of weather delay from how often, and for how long, that threshold was crossed in each year of the record. Because every activity is measured against the same 45 years, the correlation between activities that share the same weather is kept and passed to the risk tool with the distributions. As a Reviewed workflow, an EHAB analyst checks the distributions and correlation structure before release. Full method: see our method page.

What you get

  • Weather risk distributions
  • Correlation structure
  • P50/P80 dates
  • Tornado contribution

Connects to  Safran · Acumen · PRA · OPC · N&L

Who is this for?

Risk managers and QSRA analysts

A weather driver that is correlated, site-specific and explainable to the client.

Planners

Consistency between the deterministic allowance (3.1) and the probabilistic model.

Clients and programme offices

A common weather basis across contractors on a framework.

More for: Planners and schedulers

Standards and contracts referenced

Proof

Pomerleau's first Safran run moved a P80 four months.

Priced from 2,250 credits. Results in 1–2 days.

Sign up free with 1,000 credits and no card. The exact price shows in the app before you confirm.

Running it across a division? See credit packs →

Questions about QSRA weather risk

Can't find it? Email sales@ehab.co.

What is a QSRA weather driver?

A QSRA weather driver is a risk input in a quantitative schedule risk analysis that applies weather uncertainty to every activity the weather affects, in a linked way, instead of one three-point range on a single line. WeatherWise builds it from 45 years of weather at the site, with a distribution for each weather-sensitive activity and the correlation between activities preserved.

Why should weather risks be correlated across activities?

Weather risks should be correlated because the same weather hits many activities at once: a cold January affects pours, lifts, earthworks and external finishes together. If a QSRA samples each activity's weather independently, good and bad draws cancel out, the spread narrows and the P80 comes out too early. WeatherWise keeps the correlation found in 45 years of site weather, so the tail is not understated.

Which risk tools does it export to?

WeatherWise exports QSRA weather risk distributions, with their correlation structure, to Safran Risk, Deltek Acumen Risk and Primavera Risk Analysis. It also works with Oracle Primavera Cloud and Nodes & Links. You bring the programme and name the risk tool you use, and the weather risk is prepared for that tool.

How did the SMP Alliance use WeatherWise?

Morgan Sindall Infrastructure and United Utilities used WeatherWise across the SMP Alliance's 100+ water infrastructure projects to standardise weather risk management. Each project got a site-specific weather calendar from the same method, weather was recorded automatically at every site, and a portfolio dashboard showed weather risk across the programme. The SMP Alliance case study has the detail.

How does the P80 in QSRA relate to the P80 allowance?

The P80 weather allowance and the QSRA P80 answer different questions. The P80 allowance is the number of weather-lost days per activity type that four years in five stay within, built into the programme calendars. The QSRA P80 is the completion date the project meets with 80% confidence once weather and every other risk are combined. WeatherWise draws both from the same site data, which keeps the two models consistent and helps avoid counting the same weather twice.

Often run with the QSRA Weather Risk Model

YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS

3.1Weather Downtime Allowance Report

⚡ Instant

How much weather should you allow in the bid?

Starting from 1,500 credits per programme

as little as 4 min · 5 steps

What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.

You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail

Connects to  P6 · Asta · OPC · Safran

WEATHER RISK · RE-RUN ON THE UPDATE 4.1 BAD JANUARYOCTNOVDECJANFEBMARAPRMAYJUNP80P50

4.1Live Weather Calendar Service

⚡ Instant

Is your programme still on the tender weather calendars?

Starting from 100 credits per site per month

On demand · 4 steps

What it doesRe-runs the weather risk on each programme update you import and generates fresh weather calendars to import into P6 or Asta, or syncs them into OPC, on demand.

You getRefreshed weather calendars · Revised P50/P80 completion · Calendars for P6, Asta and OPC

Connects to  P6 · Asta · OPC

Coming soon
MITIGATION vs REPROGRAMME 3.4 P(FROST) 34%ENCAPSULATE + HEATMOVE TO SPRINGPROB-WEIGHTED £

3.4Weather Mitigation Appraisal

⚡ Instant

Protect the work or reprogramme it?

Expected: Starting from 600 credits per programme

as little as 4 min · 5 steps

What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.

You'll getDecision table · Probability-weighted cost per option · Preferred option

Output  Excel workbook · PDF report

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.