Weather and climate workflows for quantity surveyors and commercial managers

Never lose a weather entitlement.

The contract weather line today; the monthly check and the daily record behind every claim coming soon.

Quantity surveyors lose money to weather through a contract weather line accepted without evidence, site records that show what the weather was but not what it stopped, and compensation events notified after the time bar. WeatherWise by EHAB sets the NEC weather baseline from the site's 45-year record today. Coming soon, it will check every measurement each month against the 1-in-10-year values, so qualifying events will be flagged before the notification period closes, and a daily evidence ledger will keep the site record.

Where quantity surveyors and commercial managers start

CONTRACT WEATHER LINE · NEC 3.3 RAIN>5MMFROSTSNOWJFMAMJJASOND31 km · +84 mSTN

3.3NEC Contract Weather Baseline

⚡ Instant

Set the NEC weather baseline for the site

Starting from 350 credits per contract

as little as 2 min · 4 steps

What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.

You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options

Output  PDF report

Coming soon
EVIDENCE LEDGER · WHAT IT STOPPED 4.7 12 NOV13 NOVLOST 4h14 NOV15 NOVLOST 2h16 NOVWHAT DID ITSTOP TODAY?PourLiftEarthworks

4.7Weather Evidence Ledger

⚡ Instant

Record exactly what the weather stopped each day

Expected: Starting from 100 credits per site per month

Runs daily · 5 steps

What it will doRecords weather at the site and the contract station, asks the site team to log the activities, crews and plant affected, links the record to the programme, and raises early-warning prompts.

You'll getDaily record · What-it-stopped log · Station comparison · Early-warning prompts · Claim-ready pack

Connects to  P6 · Asta

Coming soon
WEATHER CLAIM · MONTHLY CHECK 5.1 JFMAMJJASOND1-IN-105 WKTIME BAR

5.1NEC4 Compensation Event Report

⚡ Instant

Check NEC4 weather compensation events before the time bar

Expected: Starting from 450 credits per event

as little as 3 min · 4 steps

What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.

You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme

Output  Word reportConnects to  P6 · Asta

All workflows for quantity surveyors and commercial managers

WEATHER RISK · RE-RUN ON THE UPDATE 4.1 BAD JANUARYOCTNOVDECJANFEBMARAPRMAYJUNP80P50

4.1Live Weather Calendar Service

⚡ Instant

Is your programme still on the tender weather calendars?

Starting from 100 credits per site per month

On demand · 4 steps

What it doesRe-runs the weather risk on each programme update you import and generates fresh weather calendars to import into P6 or Asta, or syncs them into OPC, on demand.

You getRefreshed weather calendars · Revised P50/P80 completion · Calendars for P6, Asta and OPC

Connects to  P6 · Asta · OPC

Coming soon
WAS THE WEATHER EXCEPTIONAL? 5.2 FAR ABOVE NORMALNORMAL RANGE

5.2Exceptionally Adverse Weather Report

✓ Reviewed

Prove when the weather was exceptionally adverse

Expected: Starting from 1,500 credits per claim

2–4 days · 4 steps

What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.

You'll getDeparture-from-normal report · Affected-activity schedule · Concurrency notes · JCT/FIDIC-ready pack

Output  Word report · PDF report

Coming soon
ANNUAL RESILIENCE REPORT 6.8 CLIMATE RESILIENCE · FY26DAYS LOST312EVENTS14tCO₂e1.9kYEAR ON YEAR12 SITES · 1 REPORT

6.8Annual Climate Resilience Report

✓ Reviewed

One annual climate resilience report across every site

Expected: Starting from 2,500 credits per year

3–5 days · 3 steps

What it will doBrings the year's weather, downtime, events and near-misses across the portfolio into one board-ready resilience report.

You'll getPortfolio resilience report · Weather events with costs · Downtime and carbon totals · Year-on-year trend

Output  Word report · Excel workbookConnects to  API

Standards quantity surveyors and commercial managers work to

Questions from quantity surveyors and commercial managers

What is the notification period for an NEC4 weather compensation event?

The notification period is eight weeks. Under NEC4 clause 61.3 the contractor notifies a compensation event within eight weeks of becoming aware of it; if it does not, it loses the right to a change in the Prices, the Completion Date or a Key Date, unless the Project Manager should have notified the event. The WeatherWise NEC4 weather compensation event check (coming soon) will run the weather check monthly and count down the notification period for each qualifying measurement.

What if the Contract Data weather station is far from the site?

The named station still governs, because NEC4 assesses weather at the place stated in the Contract Data. The time to challenge a distant or unrepresentative station is before the contract is signed. WeatherWise compares the site's 45-year record with the proposed station month by month, so the difference can be negotiated with evidence at tender rather than discovered during a claim.

Does weather give entitlement to money under JCT?

No. Under JCT, exceptionally adverse weather is a Relevant Event, so it can give an extension of time, but it is not a Relevant Matter, so it does not give loss and expense. Under NEC4, a weather compensation event can change both time and the Prices. The WeatherWise monthly NEC4 check and the exceptionally adverse weather pack for the JCT route are both coming soon. Either way, the contract decides what the evidence is worth.