Exceptionally Adverse Weather Report5.2✓ ReviewedComing soon

Prove the weather was exceptional.

JCT and FIDIC set no measurable threshold for it. Coming soon: a measure from 45 years at the site.

JCT and FIDIC make exceptionally adverse weather a ground for extension of time but set no measurable threshold for "exceptionally", so it gets argued rather than measured. Coming soon, WeatherWise will compare the weather in the claim period with the site's 45-year record and its 1-in-10-year values, identify which parameters were exceptional and by how much, link them to the activities the site records show were stopped, and assemble the pack a contract administrator or adjudicator expects. Once the evidence ledger (4.7), also coming soon, has been running, most of the site evidence will already exist.

Expected: Starting from 1,500 credits per claim

Want it when it launches? Email us about your project and we'll tell you the day it's live.

Your 1,000 free credits work on the live workflows now.

WAS THE WEATHER EXCEPTIONAL? 5.2 FAR ABOVE NORMALNORMAL RANGE
2–4 days · 4 stepsDeparture-from-normal report

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesToday an exceptionally adverse weather claim can cost £15,000 to £120,000 in claims consultancy. The contractor is left proving a negative from records that were never kept for the purpose.What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.
Time and cost£15,000–£120,000 in claims consultancy · proving a negative from records never kept for thisExpected: 2–4 days · 4 steps · ✓ ReviewedComing soon — your 1,000 free credits work on the live workflows now.

By-hand figures are EHAB market benchmarks. Where they come from.

Coming soon

Why we're building the Exceptionally Adverse Weather Report

  1. 1

    JCT and FIDIC set no measurable threshold for 'exceptional', so it gets argued rather than measured.

  2. 2

    Claims consultancy for this runs £15k–£120k.

  3. 3

    Once the evidence ledger, also coming soon, has been running, most of the evidence will already exist.

Where it will save you time

An evidence pack in days instead of months of reconstruction.

What happens next

  1. 1. Email sales@ehab.co — tell us about your project.
  2. 2. We email you the day the Exceptionally Adverse Weather Report goes live.
  3. 3. Expected to start from 1,500 credits; your 1,000 free credits work on the live workflows now.

Early projects help shape what it delivers.

Preview: the Contractual Downtime Report · 1mWatch on YouTube →

Coming soon: this report is not in the app yet.

Exceptionally adverse weather claim: how it's done today

JCT and FIDIC set no measurable threshold for exceptional weather, so it's argued rather than measured, and the contractor is proving a negative from records that were never kept for this purpose.

Today, proving exceptionally adverse weather usually means paying a claims consultant to reconstruct the period long after the event.

  1. Instruct a claims consultant to prepare the exceptionally adverse weather claim.
  2. Have the consultant reconstruct the claim period from site records that were never kept for this purpose.
  3. Argue concurrency with nothing to separate the weather from other causes of delay.
  4. Settle the extension of time claim low.

What WeatherWise will do instead

We will run the departure-from-normal analysis for the site and the period against the long-run record, then link it to the site records, or to the evidence ledger once it is live, to show which activities were prevented and when — with the concurrency notes that separate weather delay from everything else happening at the same time.

How is it calculated?

The WeatherWise exceptionally adverse weather pack will compare the weather in the claim period with the site's normal from 45 years of world-leading reanalysis datasets, up to 9 km grid, and with its 1-in-10-year values. It will identify which parameters departed from normal and by how much, then link those days to the activities that the site records or the evidence ledger show were prevented, with notes on concurrency. As a Reviewed workflow, an EHAB analyst will check and sign off each pack before release, typically within two to four days. Full method: see our method page.

What you'll get

  • Departure-from-normal report
  • Affected-activity schedule
  • Concurrency notes
  • JCT/FIDIC-ready pack

Output  Word report · PDF report

Who is this for?

Claims consultants and delay analysts

The meteorological half of the claim in days rather than months, with the method stated.

Quantity surveyors and commercial managers

Notices and particulars supported by data, not "worse than usual".

Contract administrators and employer's agents

The same analysis to assess the claim fairly.

More for: Claims consultants and delay analysts · Quantity surveyors and commercial managers

Standards and contracts referenced

Proof

Will read directly from the evidence ledger, once that is running too.

Be first to run the Exceptionally Adverse Weather Report.

Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.

Questions about exceptionally adverse weather claim

Can't find it? Email sales@ehab.co.

What counts as exceptionally adverse weather under JCT?

Exceptionally adverse weather under JCT is weather that is exceptional for the site and the time of year, not simply bad weather. It is a Relevant Event under the JCT Standard Building Contract and Design and Build Contract, but JCT does not define "exceptionally". In Walter Lawrence v Commercial Union Properties (1984), the weather was judged at the time the work was actually carried out, not when it was planned.

Does JCT allow loss and expense for weather?

No: under JCT, exceptionally adverse weather entitles the Contractor to an extension of time, but not to loss and expense. It is a Relevant Event, which can move the Completion Date, but it is not a Relevant Matter for loss and expense. The extension still matters, because it protects the Contractor from liquidated damages for the period of the weather delay.

How does FIDIC differ from JCT?

Both name exceptionally adverse weather as a ground for an extension of time, and neither sets a measurable threshold. JCT makes it a Relevant Event. The FIDIC Red Book lists exceptionally adverse climatic conditions in sub-clause 8.4(c) (1999) or 8.5(c) (2017). Both give an extension of time, not cost. Check the wording of your own contract and any amendments.

What evidence does a contract administrator expect?

A contract administrator will usually expect a notice given on time, weather data showing how the claim period departed from normal for the site, a record of which activities were stopped and when, and an analysis of the delay to completion. They will also look at concurrency, meaning other causes of delay in the same period. The WeatherWise exceptionally adverse weather pack will set out each of these with the method stated; acceptance is for the contract administrator, adjudicator or tribunal.

How is the weather linked to critical delay?

Weather is linked to critical delay by showing that it stopped activities on the critical path, so the completion date moved. The WeatherWise exceptionally adverse weather pack will match the days that departed from normal to the activities the site records or the evidence ledger show were prevented, and place them on the programme. Concurrency notes will separate weather delay from other delay in the same period, so the delay analyst can test the effect on completion.

Pairs with the Exceptionally Adverse Weather Report

Coming soon
WEATHER CLAIM · MONTHLY CHECK 5.1 JFMAMJJASOND1-IN-105 WKTIME BAR

5.1NEC4 Compensation Event Report

⚡ Instant

Check NEC4 weather compensation events before the time bar

Expected: Starting from 450 credits per event

as little as 3 min · 4 steps

What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.

You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme

Output  Word reportConnects to  P6 · Asta

Coming soon
WEATHER DELAY · PERIOD BY PERIOD 5.3 W1W2W3W4W5W6WEATHEROTHER

5.3As-Built Weather Delay Report

⚡ Instant

Reconstruct weather delay period by period

Expected: Starting from 2,500 credits per project

as little as 5 min · 3 steps

What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.

You'll getAs-built weather history · Window-by-window delay attribution · Export for TIA / windows analysis

Output  Excel workbookConnects to  P6

Coming soon
THE WEATHER ON THE DAY 5.4 14:20–16:40 UTCRADAR + STATIONS + 45 YRS

5.4Forensic Weather Report

✓ Reviewed

Reconstruct the weather at an exact place and time

Expected: Starting from 1,250 credits per report

1–3 days · 3 steps

What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.

You'll getSite conditions report · Uncertainty statement · Methodology annex

Output  PDF report

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.