Prove the weather was exceptional.
JCT and FIDIC set no measurable threshold for it. Coming soon: a measure from 45 years at the site.
JCT and FIDIC make exceptionally adverse weather a ground for extension of time but set no measurable threshold for "exceptionally", so it gets argued rather than measured. Coming soon, WeatherWise will compare the weather in the claim period with the site's 45-year record and its 1-in-10-year values, identify which parameters were exceptional and by how much, link them to the activities the site records show were stopped, and assemble the pack a contract administrator or adjudicator expects. Once the evidence ledger (4.7), also coming soon, has been running, most of the site evidence will already exist.
Expected: Starting from 1,500 credits per claim
Want it when it launches? Email us about your project and we'll tell you the day it's live.
Your 1,000 free credits work on the live workflows now.
Today vs WeatherWise: time and money
| Compared | By hand, today | With WeatherWise |
|---|---|---|
| What it involves | Today an exceptionally adverse weather claim can cost £15,000 to £120,000 in claims consultancy. The contractor is left proving a negative from records that were never kept for the purpose. | What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected. |
| Time and cost | £15,000–£120,000 in claims consultancy · proving a negative from records never kept for this | Expected: 2–4 days · 4 steps · ✓ ReviewedComing soon — your 1,000 free credits work on the live workflows now. |
By-hand figures are EHAB market benchmarks. Where they come from.
Coming soon
Why we're building the Exceptionally Adverse Weather Report
- 1
JCT and FIDIC set no measurable threshold for 'exceptional', so it gets argued rather than measured.
- 2
Claims consultancy for this runs £15k–£120k.
- 3
Once the evidence ledger, also coming soon, has been running, most of the evidence will already exist.
Where it will save you time
An evidence pack in days instead of months of reconstruction.
What happens next
- 1. Email sales@ehab.co — tell us about your project.
- 2. We email you the day the Exceptionally Adverse Weather Report goes live.
- 3. Expected to start from 1,500 credits; your 1,000 free credits work on the live workflows now.
Early projects help shape what it delivers.
Coming soon: this report is not in the app yet.
Exceptionally adverse weather claim: how it's done today
JCT and FIDIC set no measurable threshold for exceptional weather, so it's argued rather than measured, and the contractor is proving a negative from records that were never kept for this purpose.
Today, proving exceptionally adverse weather usually means paying a claims consultant to reconstruct the period long after the event.
- Instruct a claims consultant to prepare the exceptionally adverse weather claim.
- Have the consultant reconstruct the claim period from site records that were never kept for this purpose.
- Argue concurrency with nothing to separate the weather from other causes of delay.
- Settle the extension of time claim low.
What WeatherWise will do instead
We will run the departure-from-normal analysis for the site and the period against the long-run record, then link it to the site records, or to the evidence ledger once it is live, to show which activities were prevented and when — with the concurrency notes that separate weather delay from everything else happening at the same time.
How is it calculated?
The WeatherWise exceptionally adverse weather pack will compare the weather in the claim period with the site's normal from 45 years of world-leading reanalysis datasets, up to 9 km grid, and with its 1-in-10-year values. It will identify which parameters departed from normal and by how much, then link those days to the activities that the site records or the evidence ledger show were prevented, with notes on concurrency. As a Reviewed workflow, an EHAB analyst will check and sign off each pack before release, typically within two to four days. Full method: see our method page.
What you'll get
- Departure-from-normal report
- Affected-activity schedule
- Concurrency notes
- JCT/FIDIC-ready pack
Output Word report · PDF report
Who is this for?
Claims consultants and delay analysts
The meteorological half of the claim in days rather than months, with the method stated.
Quantity surveyors and commercial managers
Notices and particulars supported by data, not "worse than usual".
Contract administrators and employer's agents
The same analysis to assess the claim fairly.
More for: Claims consultants and delay analysts · Quantity surveyors and commercial managers
Standards and contracts referenced
- JCT Relevant Event: exceptionally adverse weather, and JCT notice of delay
- FIDIC Red Book sub-clause 8.4(c) (1999) or 8.5(c) (2017)
- Walter Lawrence & Son v Commercial Union Properties (1984) 4 Con LR 37
- Met Office / JCT purpose-built reports (comparison)
- SCL Protocol.
Will read directly from the evidence ledger, once that is running too.
Be first to run the Exceptionally Adverse Weather Report.
Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.
Questions about exceptionally adverse weather claim
Can't find it? Email sales@ehab.co.
What counts as exceptionally adverse weather under JCT?
Does JCT allow loss and expense for weather?
How does FIDIC differ from JCT?
What evidence does a contract administrator expect?
How is the weather linked to critical delay?
Pairs with the Exceptionally Adverse Weather Report
5.1NEC4 Compensation Event Report
⚡ InstantCheck NEC4 weather compensation events before the time bar
Expected: Starting from 450 credits per event
What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.
You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme
Output Word reportConnects to P6 · Asta
5.3As-Built Weather Delay Report
⚡ InstantReconstruct weather delay period by period
Expected: Starting from 2,500 credits per project
What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.
You'll getAs-built weather history · Window-by-window delay attribution · Export for TIA / windows analysis
Output Excel workbookConnects to P6
5.4Forensic Weather Report
✓ ReviewedReconstruct the weather at an exact place and time
Expected: Starting from 1,250 credits per report
What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.
You'll getSite conditions report · Uncertainty statement · Methodology annex
Output PDF report
Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.