New: 40 weather workflows across the construction lifecycle. Sign up and get 1,000 credits. See sustainability & reporting →

As-Built Weather Delay Report5.3⚡ InstantComing soon

Rebuild the weather delay, day by day.

The as-built weather history, ready for the delay expert — not six figures later.

Rebuilding the weather delay history is the most expensive part of a delay claim, because the information existed on site every day but was never pulled together. Coming soon, WeatherWise will combine the site's weather record, the contract station, the programme updates and whatever site records exist into a day-by-day weather delay history, period by period, with weather delay separated from other causes and the assumptions stated — ready for windows or time-impact analysis.

Expected: Starting from 2,500 credits per project

Want it when it launches? Email us about your project and we'll tell you the day it's live.

Your 1,000 free credits work on the live workflows now.

WEATHER DELAY · PERIOD BY PERIOD 5.3 W1W2W3W4W5W6WEATHEROTHER
as little as 5 min · 3 stepsAs-built weather history

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesToday it costs six figures to rebuild a project's weather delay history after the event. The same information existed on site every day.What it will doBuilds a day-by-day weather delay history from site records and programme updates, ready for TIA or windows analysis.
Time and costSix figures to rebuild what existed daily on siteExpected: as little as 5 min · 3 steps · ⚡ InstantComing soon — your 1,000 free credits work on the live workflows now.

By-hand figures are EHAB market benchmarks. Where they come from.

Coming soon

Why we're building the As-Built Weather Delay Report

  1. 1

    Rebuilding the weather delay history is the most expensive part of a delay claim.

  2. 2

    The information existed on site every day but was never pulled together.

  3. 3

    The evidence ledger (also coming soon) and your programme updates will build it as you go.

Where it will save you time

Minutes to export, instead of six figures of reconstruction.

What happens next

  1. 1. Email sales@ehab.co — tell us about your project.
  2. 2. We email you the day the As-Built Weather Delay Report goes live.
  3. 3. Expected to start from 2,500 credits; your 1,000 free credits work on the live workflows now.

Early projects help shape what it delivers.

As-built weather delay history: how it's done today

Reconstructing an as-built programme after the fact is the most expensive part of a delay claim. The information existed in daily fragments and was never assembled. Coming soon: a history assembled as you go.

Today, the as-built weather delay history is rebuilt by a delay expert long after the work is done.

  1. Instruct a delay expert to analyse the weather delay.
  2. Hand over two years of programme updates and site diaries to the delay expert.
  3. Pay for the reconstruction of the as-built weather delay history.
  4. Then pay again for the delay expert's opinion.

What WeatherWise will do instead

We will assemble the weather-attributable as-built from the evidence ledger and the programme updates, window by window, in the form a time impact or windows analysis reads directly. The expert will start at the opinion rather than the archaeology.

How is it calculated?

The WeatherWise as-built weather delay history will combine the site's weather record, the contract station, the programme updates and the evidence ledger. It will work window by window, attributing delay to weather only where the weather record and the site entries support it, with the assumptions stated. The output will be exported in P6 and XLSX formats for windows or time impact analysis. As an Instant workflow, it will return in as little as five minutes with automated checks, and the opinion on delay remains with the delay expert. Full method: see our method page.

What you'll get

  • As-built weather history
  • Window-by-window delay attribution
  • Export for TIA / windows analysis

Output  Excel workbookConnects to  P6

Who is this for?

Delay analysts and expert witnesses

The factual weather layer of the as-built analysis, reproducible and documented.

Claims consultants

Weeks of reconstruction reduced to days.

Contractors defending or bringing a claim

A consistent factual base for negotiation.

More for: Claims consultants and delay analysts · Planners and schedulers

Standards and contracts referenced

  • SCL Delay and Disruption Protocol 2nd edition (as-planned vs as-built, windows, TIA)
  • AACE RP 29R-03.
Proof

Built from records captured on the day, not reconstructed after.

Be first to run the As-Built Weather Delay Report.

Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.

Questions about as-built weather delay history

Can't find it? Email sales@ehab.co.

What is an as-built weather delay history?

An as-built weather delay history is a day-by-day record of when weather actually stopped or slowed work on a project, built from the site's weather record, the contract station, programme updates and site records. It is the factual base a delay analyst uses to test how much delay the weather caused. The WeatherWise as-built weather delay history will assemble it window by window from the evidence ledger and the programme updates, rather than reconstructing it after the event.

Which delay analysis methods will it support?

The WeatherWise as-built weather delay history will support windows analysis and time impact analysis, two of the methods described in the SCL Delay and Disruption Protocol, 2nd edition. It will export the weather history window by window, in P6 and XLSX formats that those analyses read directly. The choice of method, and the opinion on delay, stay with the delay expert.

How will weather delay be separated from other delay?

The WeatherWise as-built weather delay history will separate weather delay from other delay window by window, using the weather record, the programme updates and the daily entries in the weather evidence ledger (4.7) of what the weather stopped. Delay will be attributed to weather only where the records support a weather cause; the rest will stay with other causes, and the assumptions will be stated. Final attribution and concurrency are for the delay expert, and ultimately for the adjudicator or tribunal.

What site records will be needed?

The WeatherWise as-built weather delay history will need the programme updates across the project and the evidence ledger. Where the evidence ledger has not been running, other site records such as diaries and daily reports will be usable, though records made on the day carry more weight. The site's weather record and the contract station record will be supplied by WeatherWise, so they will not need to be collected.

Pairs with the As-Built Weather Delay Report

Coming soon
WEATHER CLAIM · MONTHLY CHECK 5.1 JFMAMJJASOND1-IN-105 WKTIME BAR

5.1NEC4 Compensation Event Report

⚡ Instant

Check NEC4 weather compensation events before the time bar

Expected: Starting from 450 credits per event

as little as 3 min · 4 steps

What it will doCompares each month's recorded weather with the 1-in-10 baseline, isolates the compensable excess, counts down the time bar and drafts the notification.

You'll getMonthly exceedance check · Excess-over-baseline calculation · Time-bar countdown · Draft notice · Impacted programme

Output  Word reportConnects to  P6 · Asta

Coming soon
WAS THE WEATHER EXCEPTIONAL? 5.2 FAR ABOVE NORMALNORMAL RANGE

5.2Exceptionally Adverse Weather Report

✓ Reviewed

Prove when the weather was exceptionally adverse

Expected: Starting from 1,500 credits per claim

2–4 days · 4 steps

What it will doCompares weather during the claim period with the site's normal range and links the departure to the activities actually affected.

You'll getDeparture-from-normal report · Affected-activity schedule · Concurrency notes · JCT/FIDIC-ready pack

Output  Word report · PDF report

Coming soon
THE WEATHER ON THE DAY 5.4 14:20–16:40 UTCRADAR + STATIONS + 45 YRS

5.4Forensic Weather Report

✓ Reviewed

Reconstruct the weather at an exact place and time

Expected: Starting from 1,250 credits per report

1–3 days · 3 steps

What it will doCombines weather stations, radar and the 45-year site record to reconstruct conditions at a specific time and location, with uncertainty stated.

You'll getSite conditions report · Uncertainty statement · Methodology annex

Output  PDF report

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.