Weather and climate workflows for estimators
Price the weather from the site's record.
Lost days and contract baselines you can put in front of bid review, with mitigation costs coming soon.
Estimators carry weather in the preliminaries and the risk line, usually priced from limited, hard-to-find data worked through by hand, which is slow and hard to defend when the client asks. WeatherWise by EHAB gives the lost-day count at the confidence the bid needs and shows how much weather the contractor carries below the contract's compensation threshold. Weather mitigation costing, to price protecting the work against moving it, is coming soon. On Eastern Green Link 2 (BAM and SSE), the weather analysis saved 27 days, an impact of around £59M.
Where estimators start
3.1Weather Downtime Allowance Report
⚡ InstantHow much weather should you allow in the bid?
Starting from 1,500 credits per programme
What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.
You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail
Connects to P6 · Asta · OPC · Safran
3.3NEC Contract Weather Baseline
⚡ InstantSet the NEC weather baseline for the site
Starting from 350 credits per contract
What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.
You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options
Output PDF report
3.4Weather Mitigation Appraisal
⚡ InstantProtect the work or reprogramme it?
Expected: Starting from 600 credits per programme
What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.
You'll getDecision table · Probability-weighted cost per option · Preferred option
Output Excel workbook · PDF report
All workflows for estimators
W.1Site Weather History Report
⚡ Instant45 years of site weather, ready to use
Starting from 150 credits per site download
What it doesShows 45 years of daily rain, wind, frost, heat and other weather at your site, as the full record, a typical year and monthly statistics.
You get45-year daily record · Typical-year percentiles · Monthly statistics
W.2Site Weather Risk Scan
⚡ InstantWhich weather will delay this job?
What it will doChecks the site against the weather limits of the main construction activities and rates each one, month by month, by how much weather is likely to stop it.
You'll getOne-page site risk summary · Activity-by-month risk heatmap · Worst months by activity · Recommended next workflows
Output PDF report · Excel workbookConnects to API
3.5Weather Window Analysis
✓ ReviewedPrice wait-on-weather before the campaign starts
Expected: Starting from 3,500 credits per campaign
What it will doRuns your offshore campaign against every year on record to show workable windows, waiting time and campaign duration by month.
You'll getWindow distribution by month · P50/P90 campaign duration · WoW day allowance · Vessel-cost exposure
Output Excel workbook
Standards estimators work to
- NEC4 ECC clause 60.1(13) and Contract Data weather measurements
- NEC4 ECC clause 31.2 (method statements)
- JCT Relevant Event: exceptionally adverse weather
- FIDIC Red Book sub-clause 8.4(c) (1999) or 8.5(c) (2017)
- BS EN 13670 (concreting in cold weather)
Questions from estimators
How do I price weather risk in a construction tender?
When is it cheaper to protect the work than to reprogramme it?
How much weather does a contractor carry under NEC4?