Weather and climate workflows for estimators

Price the weather from the site's record.

Lost days and contract baselines you can put in front of bid review, with mitigation costs coming soon.

Estimators carry weather in the preliminaries and the risk line, usually priced from limited, hard-to-find data worked through by hand, which is slow and hard to defend when the client asks. WeatherWise by EHAB gives the lost-day count at the confidence the bid needs and shows how much weather the contractor carries below the contract's compensation threshold. Weather mitigation costing, to price protecting the work against moving it, is coming soon. On Eastern Green Link 2 (BAM and SSE), the weather analysis saved 27 days, an impact of around £59M.

Where estimators start

YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS

3.1Weather Downtime Allowance Report

⚡ Instant

How much weather should you allow in the bid?

Starting from 1,500 credits per programme

as little as 4 min · 5 steps

What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.

You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail

Connects to  P6 · Asta · OPC · Safran

CONTRACT WEATHER LINE · NEC 3.3 RAIN>5MMFROSTSNOWJFMAMJJASOND31 km · +84 mSTN

3.3NEC Contract Weather Baseline

⚡ Instant

Set the NEC weather baseline for the site

Starting from 350 credits per contract

as little as 2 min · 4 steps

What it doesCalculates the monthly 1-in-10-year weather values for the NEC Contract Data from the site's own 45-year record.

You getContract Data schedule · Monthly 1-in-10-year values · Bespoke measurement options

Output  PDF report

Coming soon
MITIGATION vs REPROGRAMME 3.4 P(FROST) 34%ENCAPSULATE + HEATMOVE TO SPRINGPROB-WEIGHTED £

3.4Weather Mitigation Appraisal

⚡ Instant

Protect the work or reprogramme it?

Expected: Starting from 600 credits per programme

as little as 4 min · 5 steps

What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.

You'll getDecision table · Probability-weighted cost per option · Preferred option

Output  Excel workbook · PDF report

All workflows for estimators

45 YRS · YOUR GRID CELL · 80+ VARIABLES W.1 1979LATEST MONTHDAYS > 5 MM · FROST · WIND > 20 M/S

W.1Site Weather History Report

⚡ Instant

45 years of site weather, ready to use

Starting from 150 credits per site download

as little as 2 min · 3 steps

What it doesShows 45 years of daily rain, wind, frost, heat and other weather at your site, as the full record, a typical year and monthly statistics.

You get45-year daily record · Typical-year percentiles · Monthly statistics

Coming soon
SITE WEATHER RISK SCAN · 7 ACTIVITIES W.2 EARTHWORKSCONCRETELIFTINGSTEELWORKROOFINGSURFACINGCOATINGSJFMAMJJASOND

W.2Site Weather Risk Scan

⚡ Instant

Which weather will delay this job?

as little as 2 min · 2 stepsPortfolio pricing

What it will doChecks the site against the weather limits of the main construction activities and rates each one, month by month, by how much weather is likely to stop it.

You'll getOne-page site risk summary · Activity-by-month risk heatmap · Worst months by activity · Recommended next workflows

Output  PDF report · Excel workbookConnects to  API

Coming soon
OFFSHORE · WORKABLE WINDOWS 3.5 JFMAMJJASONDWAIT ON WEATHER 18–31 DAYS

3.5Weather Window Analysis

✓ Reviewed

Price wait-on-weather before the campaign starts

Expected: Starting from 3,500 credits per campaign

3–5 days · 5 steps

What it will doRuns your offshore campaign against every year on record to show workable windows, waiting time and campaign duration by month.

You'll getWindow distribution by month · P50/P90 campaign duration · WoW day allowance · Vessel-cost exposure

Output  Excel workbook

Standards estimators work to

Questions from estimators

How do I price weather risk in a construction tender?

Price it from the site's weather record, activity by activity. WeatherWise runs the programme's weather-sensitive activities against 45 years at the site and returns lost days at P20, P50 and P80, so the preliminaries and risk allowance rest on a stated confidence level. Under NEC4, weather below the 1-in-10-year line stays with the contractor, so the contract weather baseline shows how much of it sits in the price.

When is it cheaper to protect the work than to reprogramme it?

Protection is cheaper when the probability-weighted cost of the stopping weather, in lost days and standing resources, exceeds the cost of encapsulation, heating or other protection. The answer changes by activity and by month. WeatherWise weather mitigation costing (coming soon) will price both options against the probability of that weather at the site, from 45 years of record, so the tender can carry a reasoned winter-working line.

How much weather does a contractor carry under NEC4?

Under NEC4 the contractor carries all weather up to the level the contract's weather data show occurring on average once in ten years, for each measurement and calendar month. Only the excess over that line is a compensation event under clause 60.1(13). WeatherWise sets the line from the site's own 45-year record and compares it with the named station, so the estimator can see the retained weather before pricing it.