New: 40 weather workflows across the construction lifecycle. Sign up and get 1,000 credits. See sustainability & reporting →

Design code weather values checked against 45 years at your site, coming soon

Coming soon: the code, checked against the site.

Wind, snow and rain values tested against 45 years of what actually happened.

The wind, snow, temperature and driving-rain values in the Eurocodes and British Standards come from national maps built on records that ended decades ago. WeatherWise will compare the code value at your site with the observed and reanalysis record from the last 45 years, fit extreme value distributions with the uncertainty shown, and alert you when a climate allowance or guidance revision changes a value your live designs depend on.

Design workflows

Design values can be based on records that ended decades ago. Coming soon: check them against the last 45 years at the site.

Showing 5 of 5 workflows

Workflow types

⚡ InstantWill run automatically, with results in as little as a few minutes.

✓ ReviewedWill be checked by an EHAB analyst before release, with results in 1–6 days, depending on the workflow.

Coming soon
DESIGN WIND SPEED CHECK 2.1 CODE VALUE22.0 m/sYOUR SITE24.1 m/sΔ +9.5%

2.1Design Wind Speed Check

⚡ Instant

Check the design wind speed against the site

Expected: Starting from 350 credits per site

as little as 2 min · 2 steps

What it will doCompares the wind speed in the design code with 45 years of conditions at the site and quantifies the difference.

You'll getSite check note · Code vs observed · Confidence band

Output  PDF report

Coming soon
SNOW · FROST · ROOF LOADS 2.2 DRIFTGROUND SNOW LOADCODESITE0.50 → 0.70 kN/m²

2.2Snow and Thermal Load Check

⚡ Instant

Check snow, frost and thermal design values

Expected: Starting from 350 credits per site

as little as 2 min · 3 steps

What it will doCompares code snow, frost and temperature values with 45 years of site conditions and flags material differences.

You'll getSite check note · Thermal envelope · Exceptional-snow flag

Output  PDF report

Coming soon
RAIN ON THE FACADE · AT YOUR SITE 2.3 SHELTMODSEVEREV.SEV

2.3Driving Rain Exposure Report

⚡ Instant

Check driving rain exposure at the facade

Expected: Starting from 275 credits per site

as little as 2 min · 3 steps

What it will doCalculates how strongly wind-driven rain affects the facade at this site, rather than relying only on a national grid value.

You'll getExposure grade · Driving rain rose · Deviation flag

Output  PDF report

Coming soon
WORST CASE · WITH ERROR BARS 2.4 1:21:101:1001:1000

2.4Extreme Value Analysis Report

✓ Reviewed

Quantify the weather extremes your design needs to withstand

Expected: Starting from 950 credits per site

1–3 days · 4 steps

What it will doEstimates 1-in-100 and 1-in-1,000 year wind, rainfall and temperature extremes, with uncertainty bands and method comparison.

You'll getReturn-period table · Uncertainty bands · Method comparison

Output  Excel workbook · PDF report

Coming soon
CLIMATE ALLOWANCE WATCH · MONTHLY 2.5 REV 2026A66 · RIVER EDENAFFECTEDM4 J12 · THAMESHS2 · COLNEAFFECTEDSOLENT HUB

2.5Climate Allowance Monitor

⚡ Instant

Know when updated climate guidance affects a live design

Expected: Starting from 25 credits per project per month

Runs monthly · 3 steps

What it will doMonitors regulator guidance and flags live designs affected by changes in hazard, river basin or asset lifetime assumptions.

You'll getChange alert · Affected-project list · Re-run checklist

Alerts by  EmailConnects to  API

Who is this phase for?

  • Structural engineers checking basic wind velocity and snow load
  • Facade engineers grading driving-rain exposure
  • Engineers of record who need the return-period evidence behind a value
  • Design managers watching guidance changes across a portfolio of live schemes

Standards and contracts in this phase

  • BS EN 1991-1-4 (wind) and UK National Annex
  • BS EN 1991-1-3 (snow)
  • BS EN 1991-1-5 (thermal)
  • BS 8104 (driving rain)
  • ISO 15927
  • Environment Agency and Defra climate change allowances.

Questions about design

Is the National Annex wind map still valid for my site?

The UK National Annex to BS EN 1991-1-4 remains the basis for design, but its wind map was built on records that ended decades ago, so it is worth checking. The WeatherWise design wind speed check (coming soon) will compare the National Annex basic wind velocity at your site with the 50-year return value from the last 45 years, with confidence bands on both, so any divergence will be found before the design is fixed.

How is a 1-in-1,000-year value estimated from 45 years of data?

It is estimated by fitting an extreme value distribution to the largest values in the record and extrapolating. With 45 years of data, a 1-in-1,000-year value lies far beyond the record, so its uncertainty is wide. WeatherWise extreme weather return periods (coming soon) will fit several extreme value methods at once and show the spread between them as error bars, so the engineer will see both the central estimate and how far it can be relied on. An analyst will review each fit before release.

What happens when the climate change allowance is revised mid-design?

The design has to be checked against the revised allowance, and the first task is knowing which schemes are affected. WeatherWise climate allowance alerts (coming soon) will record which allowance and guidance version each live design relies on, and flag the affected schemes, and the size of the change, when the Environment Agency, Defra or a code body revises it. Whether the revision must be adopted depends on the scheme's stage and the planning authority's position.

Start free with 1,000 credits.

No card required. In the app, every workflow shows its price before you run it, and nothing runs without your confirmation.

Running it across a division? See credit packs →