How bad can the weather get?
1-in-100 and 1-in-1,000 year values — with the error bars shown.
A worst-case weather study typically costs £10,000 to £35,000, takes weeks, and returns one number with no sense of how certain it is. Coming soon, WeatherWise will fit extreme value distributions to 45 years of site data for wind, rainfall and temperature, using several methods at once, and return the 1-in-2 to 1-in-1,000-year values with the spread between methods shown as error bars. An analyst will review the fit before release.
Expected: Starting from 950 credits per site
Want it when it launches? Email us about your project and we'll tell you the day it's live.
Your 1,000 free credits work on the live workflows now.
Today vs WeatherWise: time and money
| Compared | By hand, today | With WeatherWise |
|---|---|---|
| What it involves | A standard extreme weather return-period study costs £10,000 to £35,000 today. It usually returns one value per return period, with no statement of how certain that value is. | What it will doEstimates 1-in-100 and 1-in-1,000 year wind, rainfall and temperature extremes, with uncertainty bands and method comparison. |
| Time and cost | £10,000–£35,000 standard study | Expected: 1–3 days · 4 steps · ✓ ReviewedComing soon — your 1,000 free credits work on the live workflows now. |
By-hand figures are EHAB market benchmarks. Where they come from.
Coming soon
Why we're building the Extreme Value Analysis Report
- 1
Worst-case weather studies cost £10k–£35k and take weeks.
- 2
They usually give one number, with no sense of how certain it is.
- 3
We will run several methods at once and show you the spread.
Where it will save you time
Days instead of weeks — with the uncertainty on the page.
What happens next
- 1. Email sales@ehab.co — tell us about your project.
- 2. We email you the day the Extreme Value Analysis Report goes live.
- 3. When it launches, your first run will be on your 1,000 free credits.
Early projects help shape what it delivers.
Extreme weather return periods: how it's done today
The record is usually far shorter than the return period being extrapolated to, and different methods on the same data give materially different 100-year values. Coming soon: all of them, side by side.
Today, an extreme weather return-period study is commissioned from a consultant and usually runs in four steps.
- Scope the extreme weather study with a consultant.
- Wait weeks for the study to come back.
- Receive a return-period table with one method and one number per row.
- Ask what the uncertainty in those numbers is, and wait again for the answer.
What WeatherWise will do instead
We will run GEV and GPD fits on wind, rainfall and temperature at the site, out to 1-in-1,000, and hand back the return-period table with uncertainty bands and a comparison across methods — so the reviewer can see how much of the answer is the data and how much is the fit.
How is it calculated?
WeatherWise will use 45 years of world-leading reanalysis datasets, up to 9 km grid, for the site, covering wind, rainfall and temperature. It will fit generalised extreme value distributions to annual maxima and generalised Pareto distributions to peaks over a chosen threshold, then extrapolate to return periods from 1-in-2 to 1-in-1,000 years with an uncertainty band on each value. The results from each method will be set side by side so the spread between methods will be visible. Because this will be a Reviewed workflow, an EHAB analyst will check the fits and threshold choices and sign off the results before release. Full method: see our method page.
What you'll get
- Return-period table
- Uncertainty bands
- Method comparison
Output Excel workbook · PDF report
Who is this for?
Structural and civil engineers
Return-period values with a defensible uncertainty statement for the design basis.
Risk managers and insurers
The worst-case weather at a site for business continuity and cover decisions.
Infrastructure owners
Consistent extreme statistics across assets for resilience planning.
More for: Engineers
Standards and contracts referenced
- BS EN 1990 Annex
- ISO 22111
- Coles (2001) extreme value methodology
- UK Climate Projections for non-stationarity.
45 years at the site, with the method sensitivity on the page.
Be first to run the Extreme Value Analysis Report.
Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.
Questions about extreme weather return periods
Can't find it? Email sales@ehab.co.
What is a return period and what does 1-in-1,000 mean?
How can 45 years of data estimate a 1,000-year event?
Which distributions will be fitted?
Why show more than one method?
Pairs with the Extreme Value Analysis Report
2.1Design Wind Speed Check
⚡ InstantCheck the design wind speed against the site
Expected: Starting from 350 credits per site
What it will doCompares the wind speed in the design code with 45 years of conditions at the site and quantifies the difference.
You'll getSite check note · Code vs observed · Confidence band
Output PDF report
2.2Snow and Thermal Load Check
⚡ InstantCheck snow, frost and thermal design values
Expected: Starting from 350 credits per site
What it will doCompares code snow, frost and temperature values with 45 years of site conditions and flags material differences.
You'll getSite check note · Thermal envelope · Exceptional-snow flag
Output PDF report
2.3Driving Rain Exposure Report
⚡ InstantCheck driving rain exposure at the facade
Expected: Starting from 275 credits per site
What it will doCalculates how strongly wind-driven rain affects the facade at this site, rather than relying only on a national grid value.
You'll getExposure grade · Driving rain rose · Deviation flag
Output PDF report
Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.