Weather Mitigation Appraisal3.4⚡ InstantComing soon

Protect the work, or move it?

Both options, priced against the odds of the weather that stops the work.

Every weather-sensitive activity has a choice: protect it (encapsulate, heat, tent, treat) or move it to a better season. WeatherWise weather mitigation costing, coming soon, will price both against the probability of the weather that would stop the work, from 45 years at the site, so the estimator and planner can compare the probability-weighted cost of mitigation with the probability-weighted cost of the delay, activity by activity.

Expected: Starting from 600 credits per programme

Want it when it launches? Email us about your project and we'll tell you the day it's live.

Your 1,000 free credits work on the live workflows now.

MITIGATION vs REPROGRAMME 3.4 P(FROST) 34%ENCAPSULATE + HEATMOVE TO SPRINGPROB-WEIGHTED £
as little as 4 min · 5 stepsDecision table

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesPricing weather mitigation by hand takes 3 to 15 estimator days today. Even then, the probability of the weather it protects against never gets quantified.What it will doCompares the probability-weighted cost of mitigation — such as encapsulation, heating or ground protection — with moving the activity.
Time and cost3–15 estimator days — and the probability never gets quantifiedExpected: as little as 4 min · 5 steps · ⚡ Instant · up to 1,100× fasterComing soon — your 1,000 free credits work on the live workflows now.

By-hand figures are EHAB market benchmarks. Where they come from.

Coming soon

Why we're building the Weather Mitigation Appraisal

  1. 1

    The choice between protecting the work and moving it is binary and expensive, and it is usually made without working out how likely the stopping weather is.

  2. 2

    Pricing the options by hand takes 3–15 estimator days, and the probability still never gets quantified.

  3. 3

    The weather downtime allowance already works out, from 45 years at the site, how likely each day is to be lost for each activity.

Where it will save you time

From 3–15 estimator days to minutes, with the probability and the risk carried written down.

What happens next

  1. 1. Email sales@ehab.co — tell us about your project.
  2. 2. We email you the day the Weather Mitigation Appraisal goes live.
  3. 3. When it launches, your first run will be on your 1,000 free credits.

Early projects help shape what it delivers.

Weather mitigation costing: how it's done today

Winter start, exposed site. The estimator has to decide: temporary roof and heating at six figures, or reprogramme the sensitive work into spring and eat the delay. The decision is binary, expensive, and made without ever quantifying how likely the condition actually is.

Today, the choice between protecting weather-sensitive work and moving it is made on cost alone, in six steps.

  1. Quantify the scaffold and sheeting needed to encapsulate the work.
  2. Price the heater hire for winter working.
  3. Present the weather protection cost at bid review.
  4. Get told the protection cost makes the bid uncompetitive.
  5. Take the weather protection out of the tender.
  6. Carry the weather risk without a price on it.

What WeatherWise will do instead

We will take the activity, the threshold and the window, and quantify the probability of the condition across 45 years at the site. Then we will cost each option — encapsulate, heat, protect the ground, or move the activity — on a probability-weighted basis. You will get a decision table you can put in front of the bid review, with the risk you're carrying written down either way.

How is it calculated?

WeatherWise will use 45 years of world-leading reanalysis datasets, up to 9 km grid, for the site. For the activity, its weather threshold and its programmed window, it will estimate the probability of the stopping condition from how often and for how long the threshold was crossed in that window across the record, using the same Monte Carlo engine as the weather downtime allowance. Each option, whether encapsulation, heating, ground protection or moving the activity, will then be costed on a probability-weighted basis using the costs you supply. As an Instant workflow, results will pass automated checks and can return in as little as a few minutes. Full method: see our method page.

What you'll get

  • Decision table
  • Probability-weighted cost per option
  • Preferred option

Output  Excel workbook · PDF report

Who is this for?

Estimators

A defensible winter-working and protection line in the tender.

Planners

A quantified reason to move an activity, or to leave it where it is.

Bid managers

A method statement that shows the client how weather risk was reasoned about.

More for: Estimators · Planners and schedulers

Standards and contracts referenced

Proof

Will run on the same engine as the downtime allowance.

Be first to run the Weather Mitigation Appraisal.

Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.

Questions about weather mitigation costing

Can't find it? Email sales@ehab.co.

When is it cheaper to protect the work than to reprogramme it?

Protecting the work is cheaper when its cost is lower than the probability-weighted cost of leaving the work exposed or moving it. A probability-weighted cost is the cost of the weather delay multiplied by the chance of the stopping weather occurring in the activity's window. WeatherWise weather mitigation costing (coming soon) will work out that chance from 45 years of weather at the site and compare every option, including moving the activity, in one decision table.

What mitigation types will be priced?

WeatherWise weather mitigation costing, coming soon, will price four routes for a weather-sensitive activity: encapsulation, such as temporary roofs and sheeting; heating; ground protection; and moving the activity to a better season. You will supply the cost of each mitigation, and WeatherWise will weight it by the probability of the condition you are protecting against. The result will be a decision table with a probability-weighted cost for each option and a recommended route.

How will the probability of the stopping weather be estimated?

The probability of the stopping weather will be estimated from 45 years of world-leading reanalysis datasets, up to 9 km grid, for the site. WeatherWise will take the activity, its threshold, such as frost for a concrete pour, and its programmed window, then measure how often and for how long the threshold was crossed in that window in each year. It will use the same Monte Carlo engine as the weather downtime allowance (3.1).

Will this feed the downtime allowance (3.1)?

Not automatically, but the two will sit on the same basis. Weather mitigation costing, coming soon, will run on the same simulation engine, site weather and activity thresholds as the weather downtime allowance (3.1). Once you decide to protect an activity or move it, run the downtime allowance on the updated programme, and its calendars and P20, P50 and P80 lost days will reflect that decision. The decision table will record the risk carried either way.

Pairs with the Weather Mitigation Appraisal

YOUR PROGRAMME × 45 YEARS OF WEATHER 3.1 P20P50P8023 DAYS

3.1Weather Downtime Allowance Report

⚡ Instant

How much weather should you allow in the bid?

Starting from 1,500 credits per programme

as little as 4 min · 5 steps

What it doesImports your programme, identifies weather-sensitive activities, applies trade-specific thresholds, runs 45 years of weather through Monte Carlo, and generates the resulting calendars for you to import into P6 or Asta, or syncs them into OPC.

You getDowntime calendars by activity type · P20/P50/P80 lost days · Month-by-month exposure · Audit trail

Connects to  P6 · Asta · OPC · Safran

RISK MODEL · REAL WEATHER 3.2 P80+4 MONTHSONE GUESSREAL WEATHER

3.2QSRA Weather Risk Model

✓ Reviewed

Put realistic weather risk into your QSRA

Starting from 2,250 credits per programme

1–2 days · 4 steps

What it doesReplaces a single generic weather assumption with linked weather risk distributions for the activities actually exposed.

You getWeather risk distributions · Correlation structure · P50/P80 dates · Tornado contribution

Connects to  Safran · Acumen · PRA · OPC · N&L

Coming soon
CONCRETE POUR · 72-HOUR CALL 4.3 T-72hPOURFROST 02:00–06:000.8 kg/m²/h

4.3Concrete Pour Forecast

⚡ Instant

Pour now or wait?

Expected: Starting from 75 credits per site per month

Runs daily · 4 steps

What it will doForecasts temperature, wind, humidity, solar radiation, evaporation and frost through the pour and curing window, with a proceed/defer alert up to 72 hours ahead.

You'll getPour-window forecast · Evaporation and frost flags · Proceed/defer alert 72h out

Alerts by  SMS · Email

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.