Flood Risk Screening Report1.1⚡ InstantComing soon

Do you need a full FRA?

Coming soon: find out in as little as three minutes, before you pay a consultant to tell you.

A flood risk assessment (FRA) is required for planning applications on sites in Flood Zone 2 or 3, sites over one hectare, and sites with known surface-water or groundwater risk. WeatherWise flood risk screening, coming soon, will pull the fluvial, surface water, groundwater, reservoir and sewer flood layers for your boundary, apply the current Environment Agency climate change uplift, and tell you whether a full FRA is needed and what its scope should be — in as little as three minutes, before you commission one.

Expected: Starting from 450 credits per site

Want it when it launches? Email us about your project and we'll tell you the day it's live.

Your 1,000 free credits work on the live workflows now.

FLOOD SCREEN · 5 LAYERS · CLIMATE UPLIFT 1.1 SITEFZ3FZ2FRA · STANDARD
as little as 3 min · 3 stepsFlood screening report

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesToday, a desk-based flood risk assessment costs £295 to £900 and takes around three days. You only find out afterwards whether the site needs a larger, modelled study.What it will doScreens the site boundary for fluvial, surface water, groundwater, reservoir and sewer flood risk, applies the current climate uplift, and flags whether a full FRA is required.
Time and cost£295–£900 desk-based · 3 daysExpected: as little as 3 min · 3 steps · ⚡ Instant · up to 480× fasterComing soon — your 1,000 free credits work on the live workflows now.

By-hand figures are EHAB market benchmarks. Where they come from.

Coming soon

Why we're building the Flood Risk Screening Report

  1. 1

    A flood risk assessment can be a desk study of a few hundred pounds or a contested one costing fifteen thousand, and nobody tells you which until you have bought it.

  2. 2

    Today a consultant pulls the same public flood mapping you could pull, and you pay and wait either way.

  3. 3

    Screening first will mean that, if you do need an FRA, it is scoped and briefed properly.

Where it will save you time

From £295–£900 and three days of desk study to a screening result in as little as a few minutes.

What happens next

  1. 1. Email sales@ehab.co — tell us about your project.
  2. 2. We email you the day the Flood Risk Screening Report goes live.
  3. 3. When it launches, your first run will be on your 1,000 free credits.

Early projects help shape what it delivers.

Flood risk screening: how it's done today

A planning application in Flood Zone 2 or 3, or on a site over a hectare, needs a flood risk assessment. The commodity end costs a few hundred pounds and three days. The contested end costs fifteen thousand and a fight with the lead local flood authority. Nobody tells you which one you're buying until you've bought it.

Today, the usual way to find out whether a site needs a flood risk assessment is to pay a consultant to look.

  1. Commission a flood risk consultant to review the site.
  2. The consultant pulls the same public flood mapping you could have pulled yourself.
  3. The consultant reports that the site is fine, or that it needs a hydraulic model.
  4. Either way, you have paid for the flood risk desk study and waited for the answer.

What WeatherWise will do instead

From the site boundary, we will pull fluvial, surface water, groundwater, reservoir and sewer layers, apply the current climate uplift for the development lifetime, and tell you whether the site passes screening, needs a standard FRA, or needs modelling — with the scope written out so you can brief a consultant properly if you do.

How is it calculated?

WeatherWise will overlay your site boundary on public flood mapping, including the Environment Agency Flood Map for Planning, for five sources: rivers, surface water, groundwater, reservoirs and sewers. It will record the flood zone and the extent and likelihood of each source that touches the boundary, then apply the current Environment Agency climate change allowance for the development lifetime you enter. The combined result will be tested against the planning triggers for a flood risk assessment, such as Flood Zone 2 or 3 and sites over one hectare, to decide whether the site passes screening, needs a standard FRA or needs modelling. As an Instant workflow, each run will pass automated checks before the result is released. Full method: see our method page.

What you'll get

  • Flood screening report
  • Zone and layer maps
  • FRA scope recommendation

Output  PDF reportConnects to  API

Who is this for?

Developers and land buyers

An answer at option stage on whether the site carries a £300 desk study or a £15,000 contested FRA.

Civil and drainage engineers

An FRA scoped correctly first time and quoted accurately.

Planning consultants

Evidence for the sequential and exception tests before submission.

More for: Developers and asset owners · Engineers

Standards and contracts referenced

  • NPPF and Planning Practice Guidance on flood risk
  • Environment Agency Flood Map for Planning
  • EA climate change allowances for flood risk assessments
  • Flood and Water Management Act 2010 (LLFA role).
Proof

Will screen in as little as a few minutes, not days.

Be first to run the Flood Risk Screening Report.

Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.

Questions about flood risk screening

Can't find it? Email sales@ehab.co.

Which sites need a flood risk assessment in England?

In England, a site-specific flood risk assessment is needed for development in Flood Zones 2 and 3, for sites of one hectare or more in Flood Zone 1, and for Flood Zone 1 sites with critical drainage problems or risk from other sources such as surface water. A flood risk assessment (FRA) is a report showing that a development will be safe from flooding for its lifetime without increasing flood risk elsewhere. WeatherWise flood risk screening (coming soon) will show which applies before you commission one.

What is the difference between Flood Zone 2 and Flood Zone 3?

Flood Zone 2 is land with a medium probability of flooding: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or between 1 in 200 and 1 in 1,000 from the sea. Flood Zone 3 is land with a high probability: a 1 in 100 or greater annual chance from rivers, or 1 in 200 or greater from the sea. Both zones come from the Environment Agency Flood Map for Planning, which ignores flood defences.

Will the screening apply climate change allowances?

Yes. WeatherWise flood risk screening, coming soon, will apply the current Environment Agency climate change allowance for the development lifetime you enter, so the result will reflect flood risk over the life of the development, not just today. A climate change allowance is the percentage uplift applied to peak river flow, peak rainfall intensity or sea level to account for a changing climate. The Environment Agency sets different allowances by river catchment and by type of development.

Will the output be usable for the sequential test?

WeatherWise flood risk screening, coming soon, will provide evidence for the sequential test, but it will not carry out the test. The sequential test is the planning check that steers development towards the areas at lowest risk of flooding by comparing the site with reasonably available alternatives. The screening will show the site's flood zones and its risk from each source, which a planning consultant can use alongside the alternative-site search the local planning authority expects.

Will this replace a full FRA?

No. WeatherWise flood risk screening, coming soon, will not replace a full flood risk assessment. It will tell you whether a site passes screening, needs a standard FRA or needs hydraulic modelling, and write out the scope. Where an FRA is needed, a qualified consultant still prepares it for the planning application; the screening will mean you commission the right FRA first time, with a proper brief.

Pairs with the Flood Risk Screening Report

45 YRS · YOUR GRID CELL · 80+ VARIABLES W.1 1979LATEST MONTHDAYS > 5 MM · FROST · WIND > 20 M/S

W.1Site Weather History Report

⚡ Instant

45 years of site weather, ready to use

Starting from 150 credits per site download

as little as 2 min · 3 steps

What it doesShows 45 years of daily rain, wind, frost, heat and other weather at your site, as the full record, a typical year and monthly statistics.

You get45-year daily record · Typical-year percentiles · Monthly statistics

Coming soon
RAINFALL · HOW HARD, HOW OFTEN 1.2 1:100 + 40%CURRENTOLD FIGURESDURATION →mm/h

1.2Drainage Design Rainfall Report

⚡ Instant

Use the right rainfall figures for drainage design

Expected: Starting from 175 credits per site

as little as 3 min · 3 steps

What it will doReturns the rainfall figures needed for drainage design using current climate allowances, and flags when national baselines have been superseded.

You'll getRainfall input pack · Climate uplift applied · Superseded-baseline flag

Output  CSV dataConnects to  API

Coming soon
CLIMATE HAZARDS · NOW TO 2100 1.4 NOW203020502100HEATCOLDRAINWINDDROUGHTFLOOD

1.4Climate Hazard Baseline Report

✓ Reviewed

See the site's climate risk now to 2100

Expected: Starting from 950 credits per asset

1–3 days · 4 steps

What it will doShows exposure to heat, cold, heavy rain, wind, drought and flood today — and how it changes by 2030, 2050 and 2100.

You'll getHazard baseline pack · Change signals by scenario · ISO 14091-ready evidence tables

Output  Excel workbookConnects to  API

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.