New: 40 weather workflows across the construction lifecycle. Sign up and get 1,000 credits. See sustainability & reporting →

Water Stress and Drought Report6.7⚡ InstantComing soon

Will your site run short of water?

Drought risk at the site, not a basin-wide map.

Water stress usually enters a disclosure through a global map that colours a whole catchment — right for screening a portfolio, wrong for a site about to commit to a supply arrangement, a batching plant or a dust-suppression regime. Coming soon, WeatherWise will build drought, water availability and abstraction-risk exposure at the site from 45 years of record plus the projection signal, with drought return periods you can plan to and the response tables CDP Water asks for.

Expected: Starting from 500 credits per site

Want it when it launches? Email us about your project and we'll tell you the day it's live.

Your 1,000 free credits work on the live workflows now.

WATER · WILL IT RUN SHORT? 6.7 DROUGHT TRIGGER1:20 YR DROUGHTAVAILABILITY
as little as 3 min · 3 stepsWater stress baseline

Today vs WeatherWise: time and money

ComparedBy hand, todayWith WeatherWise
What it involvesToday, site water risk usually comes from a global water stress map read at catchment scale. That map says nothing about the site itself.What it will doQuantifies current drought, water availability and abstraction-risk exposure from 45 years of history plus future climate signals, formatted for CDP Water and site water plans.
Time and costA global stress map at catchment scale, which says nothing about your siteExpected: as little as 3 min · 3 steps · ⚡ InstantComing soon — your 1,000 free credits work on the live workflows now.

By-hand figures are EHAB market benchmarks. Where they come from.

Coming soon

Why we're building the Water Stress and Drought Report

  1. 1

    Water risk is usually read off a global map at river-basin scale.

  2. 2

    That says little about a site about to commit to a water supply.

  3. 3

    We will work out drought risk at the site itself.

Where it will save you time

A site answer in as little as a few minutes, not a basin-wide estimate.

What happens next

  1. 1. Email sales@ehab.co — tell us about your project.
  2. 2. We email you the day the Water Stress and Drought Report goes live.
  3. 3. When it launches, your first run will be on your 1,000 free credits.

Early projects help shape what it delivers.

Water stress and drought: how it's done today

Water stress usually enters a disclosure through a global map that colours a whole catchment. It is the right tool for screening a portfolio and the wrong one for a site that is about to commit to a supply arrangement, a batching plant, or a dust-suppression regime.

Today, water risk for a construction site is usually read off a global map, like this.

  1. Open a global water stress map to check the site.
  2. Read off the colour for the whole catchment the site sits in.
  3. Report the catchment colour as the site's water risk.
  4. Discover the site's real water supply picture during the first dry summer.

What WeatherWise will do instead

We will build drought, water availability and abstraction-risk exposure at the site itself from 45 years of record plus the projection signal, with drought return periods you can design to — and the response tables CDP Water asks for.

How is it calculated?

WeatherWise will build water availability at the site from 45 years of world-leading reanalysis datasets, up to 9 km grid, using rainfall and the related water-balance variables in the record, plus the projection signal. It will identify dry periods that fall below a stated drought trigger and fit their frequency to give drought return periods at the site. The results will be set against your abstraction or supply arrangement and arranged into the CDP Water response tables. As an Instant workflow it will return in as little as three minutes, with the inputs and results passing automated checks before release. Full method: see our method page.

What you'll get

  • Water stress baseline
  • Drought return periods
  • CDP Water response tables

Output  Excel workbookConnects to  API

Who is this for?

Sustainability leads

CDP Water and water-plan data at site resolution.

Site and project managers

Supply and abstraction risk before committing to a batching or suppression regime.

Engineers

Drought return periods for design and operations planning.

More for: Sustainability and ESG leads · Engineers

Standards and contracts referenced

  • CDP Water Security questionnaire
  • WRI Aqueduct (as comparison)
  • EA abstraction licensing
  • ISO 46001.
Proof

At the site's grid cell, not at catchment scale.

Be first to run the Water Stress and Drought Report.

Want it when it launches? Email us about your project and we'll tell you the day it's live. Your 1,000 free credits work on the live workflows now.

Questions about water stress and drought

Can't find it? Email sales@ehab.co.

Why is a catchment water-stress map insufficient for a site?

A catchment water-stress map is insufficient for a site because it gives one colour to a whole catchment. It suits screening a portfolio, not deciding on a supply arrangement, a batching plant or a dust-suppression regime. Rainfall and dry spells vary within a catchment. The WeatherWise water stress and drought workflow will assess drought and water availability at the site itself, from world-leading reanalysis datasets, up to 9 km grid.

What is a drought return period?

A drought return period is the average interval, in years, between droughts at least as severe as a given one at a location. A 1-in-20-year drought has about a 5% chance of occurring in any year. WeatherWise will estimate drought return periods at the site from 45 years of record plus the projection signal, so site water plans can be designed to a stated level of drought.

What does CDP Water ask for?

CDP's water security questions ask companies about their exposure to water-related risks, such as drought and water scarcity, and how they respond; check the current CDP questionnaire for the exact questions in your reporting year. The WeatherWise water stress and drought workflow will provide response tables for the physical exposure at each site. Water withdrawal, discharge and consumption figures remain yours to report.

Will this cover abstraction licence risk?

The WeatherWise water stress and drought workflow will cover the weather side of abstraction risk: how often dry conditions at the site could put your abstraction or supply arrangement under pressure. It will not interpret licence conditions, check compliance or predict regulator decisions. Licence conditions and restrictions are set by the regulator, such as the Environment Agency in England, so any licence-specific question stays with the licence holder.

Pairs with the Water Stress and Drought Report

Coming soon
ENERGY · WITH THE WEATHER TAKEN OUT 6.1 COLD FEBNORMALISEDMETEREDHEATING DEMAND AT THE SITEWEATHER EFFECT −6%

6.1Weather-Normalised Energy Report

⚡ Instant

Separate real energy performance from the weather

Expected: Starting from 350 credits per site per year

as little as 3 min · 3 steps

What it will doWeather-normalises energy use so year-on-year performance reflects efficiency changes rather than a mild winter or cool summer.

You'll getNormalised energy and carbon · Weather-effect split · Year-on-year variance note · SECR-ready tables

Output  Excel workbook · CSV dataConnects to  API

Coming soon
CSRD · CLIMATE RISK BY ASSET 6.2 ACUTECHRONICSHORTMEDIUMLONGHEATWAVEFLOODSTORMSEA LEVELWATER STRESSE1

6.2CSRD Physical Climate Risk Report

✓ Reviewed

Build the physical climate risk section of your CSRD report

Expected: Starting from 1,750 credits per asset

2–5 days · 4 steps

What it will doBuilds asset-level physical climate risk analysis for CSRD, with scenarios, time horizons and methodology documented.

You'll getESRS E1 physical risk tables · Hazard-by-asset matrix · Scenario and horizon coverage · Methodology annex

Output  Excel workbook · Word reportConnects to  API

Coming soon
EU TAXONOMY · CLIMATE CHECK 6.3 HEAT STRESSEXTREME PRECIPITATIONFLOOD (FLUVIAL)MEASUREWINDSTORMDROUGHTSUBSIDENCEPASSES · GREEN

6.3EU Taxonomy Climate Risk Assessment

✓ Reviewed

Run the EU Taxonomy climate risk and vulnerability assessment

Expected: Starting from 1,250 credits per asset

2–4 days · 4 steps

What it will doScreens the asset against the EU Taxonomy climate hazard list and documents the adaptation measures needed for alignment.

You'll getCRVA report · Taxonomy hazard screening · Adaptation measures register · Alignment statement

Output  Word report · Excel workbook

Written by WeatherWise team, EHAB. Method reviewed September 2026. How WeatherWise calculates site weather.